Laserfiche WebLink
<br />I <br />I <br />,. <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />, <br />I <br /> <br />9.7.01 <br /> <br />Planning-level estimates of capital expenditures has been made. Future <br />anticipated projects are also listed. The activities have been distributed <br />throughout a lO-year implementation plan extending though 2011. <br /> <br />The Capital Improvement Plan is summarized in Table 7. <br /> <br />Table 7 <br />Capital Improvement Plan <br /> <br /> Preliminary I <br />Project Project Description Project Cost Date(s) of <br />Location Description Estimate Implementation Comments <br />Feasibility Study Preliminary engineering and $43,000 1 Cost does not include <br />for Pond P-7 design surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and $19,000 1 Cost does not inciude <br />for Pond P.8 design surveying of ponds in <br /> drainage system <br />Feasibimy Study Preliminary engineering and $19,000 1 Cost does not inciude <br />for Pond P-10 design surveying of ponds in <br /> drainage system <br />FeasibilITY Study Preiiminary engineering and $19,000 1 Cost does not include <br />for Pond P.11 design I surveying of ponds in <br /> drainage system <br />Feasibimy Study Preliminary engineering and $31,000 1 Cost does not inciude <br />for Pond P-12 design surveying of ponds in <br /> drainage system <br />Feasibility Study , Cost does not include <br />Preliminary engineering and $33,000 2 <br />for Pond P-2 design surveying of ponds in <br /> drainage system <br />Feasibilify Study Preliminary engineering and $43,000 2 Cost does not inciude <br />for Pond P-3 design surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and $43,000 2 Cost does not inciude <br />for Pond P.4 design surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and $31,000 3 Cost does not include <br />for Pond P.5 design surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and $24,000 3 I Cost does not include <br />for Pond P-6 design surveying of ponds in <br /> drainage system <br />FeasibilITY Study Preliminary engineering and $38,000 3 Cost does nof i nci ude <br />for Pond P-9 design surveying of ponds In <br /> drainage system <br />Feasibility Study $343,0001 <br />Subtotal <br /> <br />City oj Arden Hills, Minnesota <br />Local Stormwater Management Plan <br /> <br />A-ARDEN0101.00 <br />Page 42 <br />