Laserfiche WebLink
<br />REVIEW SUPERVISOR FUNCTIONS <br /> <br />25 <br /> <br />Additional On-site Pre-election Training, <br />Testing, Site Surveys; maximwn 7 days <br />(Municipalities Staff & Polling Locations <br />- June/July/August, 2002) <br /> <br />fuc1udes review and <br />identification of the data transmission site in <br />each polling location or best alternative site, <br />performing modem testing from the polling <br />location and final testing of the transmission <br />of election results. <br /> <br />20 Poll Worker Training, Poll Worker Manual, <br />Open/Close Insbuctions <br />In accordance with the training outline <br />shown below. <br />(Municipalities Staff, Election <br />Judges - August, 2002) <br /> <br />On-site Election Day Coverage per Contract <br />Coverage for 2002 Countywide elections <br /> <br />Elections JP A <br /> <br />$500/day <br /> <br />$500/day <br /> <br />10,000 <br /> <br />12,500 <br /> <br />$10,000 <br /> <br />10,000 <br /> <br />150f25 <br /> <br />e <br /> <br />. <br /> <br />. <br />