Laserfiche WebLink
<br />JS~:' <br />.iJ,( <br />('t, . ' <br />:t; <br />i <br />i <br />.~ <br />fl <br /> <br />~ <br />" <br /> <br />t,. <br /> <br />~ <br /> <br />. <br /> <br />ROBERT E. Me DONALD <br /> <br />HENRY J. BOWNII( <br /> <br />DUANE T. MEYER <br /> <br />WA YNE E. BROWN <br /> <br />~\)J<:: ']2)[) J\I.:.\ 1- b?:/ ).\:) S O( J ;.\ J E 8) J J ~ ~" <br />GENERAL CONTRACTORS <br /> <br />211 NORTH PASCAL AVENUE . ST. PAUL, MINNESOTA 55104 <br />PHONE, 645,4656 <br /> <br />DELAYS - Old Highway 10, Augering, The crossing was moved south of the <br />original location. '!be original location was <br />in peaty soft material. The new location was <br />hard clay and boulders and because of the <br />boulders it took us five days to make the <br />crOSSing which should have taken 2 days. <br />labor, 336.00/day <br />F~uip. 271.75/day <br /> <br />MOVE EASEMENT - Changing the line along Freeway 694 to a line from the <br />easement to Floral Drive. Crew waiced 3 days <br />for the change to be made. <br />Labor, 336.OO/day <br />Equip. 215.05/day <br /> <br />CHANGE LINES - Easement # 12-4, line was moved west 180 ft. from original <br />location, which was dry clay, to a location <br />which is wet sandy clay. The box work and <br />clamming slowed the progress down 3 days, our <br />progress was 144 ft in 4 days which should <br />have taken 1 dav. <br />Labor, 336.oo/day <br />Equip. 215. 05/day <br /> <br />One months time for superintendent. <br />Labor, 1440.00/month. <br /> <br />EXTRA. SUPERVISION _ <br />