My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 10-12-1959 (2)
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1951-1959
>
1959
>
CC 10-12-1959 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 9:18:25 AM
Creation date
11/27/2006 9:03:03 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />• 11 <br />• with Improvement Pto. 1 and is }�eing carried forward in Inprcvement <br />ido. 2. Thus, in Nc. 3, the entire amount of the bonds, essuming <br />$35C,�00 wculd be sold and� of course� if it's not necessary to <br />have $35C,0�0 only that portion that we need, that would all be <br />paid by apecial assQssments. Now, in order to break that down� <br />you will find it in No. 5. a. ts abutting sewer per foct. That <br />is, if you h�ve a lot� for example, it would ba $10.50 per front <br />foct for ittnnediate complete service. Those in 5 b. will be <br />assessed who den't get immediate serviee but bansfit from what is <br />called an area benefit where their laterals ars not there but <br />there is trunk benefit which is called non-abutting platted <br />pronerty per front fcct cf �2.5C. <br />;Jon abutting unplatted property is $4CC.00 an aere which is <br />� an acreage charqe which is a factor on larga piac�s of property <br />that dcn't get all the latQrals. <br />The service connectio?n stub is the service connection frcm the <br />middle of the street to the property lina at a cost of 550.00. <br />Ne�r:, translating this in another way� the mill rate increase <br />would be "none" and the annual service charqe in Pdo. 7- that is <br />ihe estimated cost that will have tc b� charged by the villagQ <br />cfficials after they adopt a rates and charges ordinance for the <br />o�eraticn of the sewer department. 7his $36.00 takes into <br />consideratian all cf the costs that Roseville will charge which <br />also reflects the charges that St. Paul charges plus the normal <br />depreciation, maintenance of your system. This $36.UG was the <br />� same figure we used in ccnnection with Imgrovement No. l. There <br />aren�t tcc many cannections in Imprcvement Na. 1 and whila there ar� <br />somewhat mcre in idc. 2 it isn't what we call a full fledged system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.