My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 10-12-1959 (2)
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1951-1959
>
1959
>
CC 10-12-1959 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 9:18:25 AM
Creation date
11/27/2006 9:03:03 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />� <br />� <br />� <br />19 <br />issue. In order to get away frcm a continual breaking up. <br />however. the stub has been added so that once you go thrcugh a <br />street and it's been zough graded cver again that .vill be the <br />ead cf it. Hr�: the villaqe intends to finanCe any permanent <br />improvem�nts to the streat thereafter is not yet known b�cause the <br />Council has not come tc that point but they have been setting <br />aside enough in thtir Read and Bridge Fund fcr certain mainttnanca <br />of raguldr streets. Gna reason you probably don't want to go into <br />full paved streets cr things cf that nature is that you den't know <br />a�hat other imprcvements might eventually come in. But it's my <br />understandin9 from sitting in with the Council befoxe that what <br />they will do and what will be done here when the contractor gets <br />done the earth is compaCted. the street will not be continually <br />dug up and certain treatment will be given tc it out of the r�gular <br />maintenance operation of the Council. If the people want anything more <br />than that. you can alwsys petltion far a paved street by coming to <br />your Council �nd agreainq ta pay for it. <br />h'R. JGNES: I have had sevezal people call my home as to the <br />high cost of the assessments and I think as compared to.Reseville <br />I think it would be well for you tc compare Rcseville where part <br />cf it went ea general taxes. <br />hR. POPOJICH: This is difficult to dc. Pec�le say here it's <br />:61G.5G and we heard that somebody else gct it for $6.50 and somebody <br />else for ib.25. You must always be careful when you ccmpare <br />between suburban villages. For exampla, is the terrain and topography <br />• of the land the same, because this enters into the tosts tco. For <br />example, dcwn in Newport wheze we were working on some material <br />abcut a year ago, it's solid rock. There the costs ran over <br />�1�.00 a foot. Over in Rosevillo it's dcwn at 56.05�and �6.25 but <br />
The URL can be used to link to this page
Your browser does not support the video tag.