My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 10-12-1959 (2)
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1951-1959
>
1959
>
CC 10-12-1959 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 9:18:25 AM
Creation date
11/27/2006 9:03:03 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />� <br />� <br />�� <br />24 <br />problem. I know you cited a lot ef villages like Hopkins� <br />Fridley� Brooklyn C�nter. Their problems are a lot different. <br />I suppcse you might even goia the Village of New Brighton and say <br />how dc we compare to New Brighton. In New Brighton th�y'ra paying $7.5C <br />per front foot plus somQthing on gen�ral taxes plus 570.00 extra <br />for a service charge run out te your prop�rty line. I hava talked <br />to many engineers and they said with tha problems we have in eur <br />village that's what we're faced r,ith. Nde're either geing tc livo up <br />to them or d�_: withcut tfiem. There's nc simple way cf dcing these <br />things. Water jusi doesn't flc�v up hill. You he,ve to put in lift <br />statiens. We talked about private treatment plants - ccnsidQxed <br />gcing throuqh the r'tirsenal, and as far as we have been able tc determine, <br />this is the most economical and feasible way cf doing it. If there <br />are any cther experts on hew it can be done cheaper. - I know I for <br />one weuld be one of the first to find it and de it. <br />MR. CHRISTENSEN: The thing I was wcndering abcut is this. If I <br />go to build a house I get estim�tes frcro several contractors and on a <br />thing like this I wonder why ��e cnly have an estimate frcm one firm <br />avhen there are so many around us that sre engaged in the same businQss. <br />!��?. 'rdILLIAk BFNISTEA, B, nister Engineering Company: I'm <br />� <br />Air. Sanister, onQ of tho partners af the Banist6r EngineeTing Cempany. <br />I^ the fi.rst place, we have nothing tc do with the building of the <br />sewers. '��Q design it and dc not build it. To call ir, differen�. <br />engineers - we d:n't do this work for nothing. W� have raada this <br />prQliminary study and have been paid for it. As far as cur position <br />is ccncerned, �ue act - I think T might clarify it for you - we act <br />in the same posfticn as you wouid expect an architect tc act fcr ycu <br />if ycu hsd an architect design youn c�use. And if you calied in <br />cthe= engineers, you would heve tc pay each one to make an independent <br />
The URL can be used to link to this page
Your browser does not support the video tag.