Laserfiche WebLink
All persons present were then afforded opportunity to be <br />hear d, and the names and addresses of the persons appearing and <br />heard by the Council, and the substance of the views presented <br />by them were as follows: <br />� MR. DON <br />for propose <br />indicated o <br />this is the <br />and this is <br />This is the <br />CHRISTOFFERSEN, city consulting engineer: This is <br />d Improvement 78-3, Karth Lake Estates West. As <br />n the screen - the boundaries of Karth Lake Estates West - <br />southerly line, this is Amb1e Road in this vicinity, <br />the extension of Nursery Hill Road as constructed today. <br />north line of Karth Lake Estates West, and the south <br />line. The west line is here, and the east line is Karth Lake. <br />The streets proposed in this development extend from the <br />existing street at this point to a semi-cul-de-sac runninq <br />westerly to a cul-de-sac, and another street going southerly to <br />Amble Road. The street is proposed to be 34 feet in width, <br />designed for less than 400 vehicles per day, 7-ton load street, <br />will have bituminous surfacing and concrete curb and gutter. <br />The sanitary sewer proposed to serve the development would <br />be constructed (inaudible) a manhole on the westerly portion of <br />the cul-de-sac, running easterly to another manhole, and southerly <br />to the sanitary sewer. Also, a(inaudible) would be constructed <br />from a road here to intercept this sanitary sewer. Sanitary sewer <br />will serve the abutting lots. <br />The watermain proposed will connect to the existinq water- <br />main at this point, follow generally on the north side of the <br />street, and terminate at this point. Another stretch of watermain <br />would loop the Nursery (inaudible) and connect to the Amble system <br />and-connect at Amble Road. • <br />• <br />Storm drainage improvements are as shown on the southerly portion <br />of the street generally, draining to a detention basin and outward <br />to an existing storm sewer and on to Karth Lake. You will note <br />that we have provided inlet points for the basins, or the swampy <br />areas to the south, as an assurance that the basins will not be <br />overflowed and flood the newly constructed property. It is not <br />the intent of these outlets to drain the ponding areas, but to keep <br />them at a normal level. Also, we have one constructed in this <br />position. Storm sewers are located in this position. (Inaudible) • <br />and storm sewer running to this point and draining back to the <br />detention basin, and one from this point over, and also into the <br />detention basin, and then out into Karth Lake. <br />• We find that this project is a feasi.ble undertaking, and <br />recommend it be constructed as proposed. <br />