My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-21-1999
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1999
>
CCP 06-21-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:25:17 PM
Creation date
11/13/2006 11:20:08 AM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />r <br /> <br />. <br /> <br />Memorandum, 2000 Budget Mtg. No.2 - Year 2000 CIP/Other Matters <br />Page Two <br />June 17, 1999 <br /> <br />. <br /> <br />Staff notes that drainage at Arden Manor was identified as an issue, and further notes that the <br />playground structure replacement and hard court improvements at the Arden Manor Park are <br />both somewhat dependent upon the drainage problem being resolved. <br /> <br />7. The replacement of the Hazelnut Park shelter building was budgeted for 1999. Staff has <br />since considered if a redesign to the general layout of the park is appropriate. If so, the siting <br />of the shelter may be impacted by such a change. <br /> <br />Proposed 2000 Capital Budl!et Plan Issues <br />Attached Schedule B summarizes proposed 2000 capital budget plans. Overview comments on <br />certain items follow. <br /> <br />8. No Administrative equipment was identified in the previous 1999 - 2000 CIP. Staff believes <br />that the creation of an additional PC workstation, laser printer replacements, and upgrades to <br />the network server will be needed in 2000. <br /> <br />9. Staff now believes that the majority of the new City Hall construction project will occur in <br />2000, rather than the originally budgeted construction finish work. <br /> <br />10. Staff is recommending that, with the completion of West Round Lake Road, Phase I, in 1999 . <br />and the County's completion of the Highway 96/Lexington Avenue intersection, both the <br />Gateway monument signs be installed in 2000. Funding for these projects to be out of the <br />"Non-Assessable Road Improvement" Fund No. 409. <br /> <br />11. Ramsey County has reduced the scope of their County Road I reconstruction project to now <br />terminate on the east side ofSchutta Road. Previously, the termination point was Lexington <br />Avenue. Accordingly, the City's cost participation in the project has dropped from $200,000 <br />to approximately $50,000. <br /> <br />12. Ramsey County has indicated that they intend to commence the Cleveland Avenue railroad <br />bridge replacement project during the 1999/2000 winter season. They have also revised the <br />cost estimate participation by Arden Hills downward to $30,000 from $48,000. <br /> <br />13. Staff has identified two (2) segments ofthe sanitary sewer system (near the Townhomes of <br />Lake Valentine Project) that need attention on a priority basis in 1999. The recommended <br />increase in 1999 project cost from a budgeted $75,000 to $150,000 due to project scope <br />increase, is likely to continue into 2000 until the priority repairs are completed. <br /> <br />14. Similar to the 1999 discussion at Hazelnut Park, staff is critically evaluating ifIngerson Park <br />is an appropriate location for the creation of a new soccer field, given the park's topography, <br />parking limitations, and current use level. If mass grading does occur to build the field, the . <br />location of replacement playground equipment becomes a related issue. <br />
The URL can be used to link to this page
Your browser does not support the video tag.