Laserfiche WebLink
<br /> I <br /> I D. DENSITY OF INTENSITY OF LAND USE <br /> I The College currently has 1,650 full time equivalent students with 514 associated <br /> staff and faculty. There are twelve (12) academic buildings on 107 acres. With the <br /> I proposed increase in buildings, total campus usage will be twenty-one (21) buildings. <br /> Building square footage will increase from the current approximate 656,306 square <br /> I feet, or 14.1 %, to approximately 1,068,091 square feet, or 22.9%. With the proposed <br /> increase to 2,400 FTE's and the related increase in staff and faculty (168), total <br /> I campus usage will be 3,082. Impervious surface on the campus currently represents <br /> approximately 951,390 square feet. With proposed improvements, impervious surface <br /> I will increase from approximately 951,390 square feet to 1,117,159 square feet. <br /> Existing impervious surface in Roseville is approximately 436,235 square feet, <br /> I increasing to 533,933 square feet. Approximate existing impervious surface in Arden <br /> Hills is 515,155 square feet, increasing to 583,166 square feet. <br /> I The proposed improvements are expected to be phased in over the next 12 to 20 <br /> years. As these capital improvements are made, related improvements for surface <br /> I water management, traffic, and parking will be made to accommodate student/faculty <br /> enrollment growth. <br /> I E. DEVELOPMENT TIMELlNE AND GENERALIZED STAGING SCHEDULE <br /> I Based on the Master Plan that was developed in 2003, over the course of 12 to 20 <br /> years, there are many proposed improvements, renovations, additions, and other <br /> I modifications. These proposed projects will address on-campus housing, parking, <br /> traffic, surface water, and classroom/office space issues faced by the College now <br /> I and with growth in the number of students, faculty, and staff. In discussions with the <br /> College, the 2003 Master Plan has been used as a baseline and updated with new <br /> I information to develop a potential phasing of the improvements. The projects listed <br /> below are preliminary and many are conceptual at this point. Over the course of 12 to <br /> 20 years, many changes could occur and this Phasing Plan is provided with <br /> I information known at this time. Reference the 2003 Master Plan map along with the <br /> newly developed Master Plan Scope located in the Appendix. <br /> I <br /> I <br /> Northwestern College Master Plan 5 13529.000 <br /> I PUD Application Report <br />