My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 01-22-2006 Work Session
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 01-22-2006 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:29:06 PM
Creation date
2/16/2007 9:57:29 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> RlII/lSiT' COIIII/1'-" idt' 1~'mt"'g(,/Icl' ()1'c'/"{lfio/ls 1'1all !<'TisiO/l 5.1. .11//It'. J()()5 <br /> Municipal EOC's . <br /> Municipal Emergency Operations Centers (EOC) are noted in the <br /> following table. <br /> All EOG's have basic back-up generated power; land line and radio <br /> communications capability; a provision for securing the facility (in all <br /> cases, the local law enforcement agency will provide or arrange for <br /> security during operations); basic sanitation needs and access to <br /> restrooms. In the event local water systems are compromised, all EOG's <br /> will require a vendor or volunteer agency to provide potable water. The <br /> local Emergency Management Director is responsible for this activity and <br /> for ensuring that all EOC facilities are appropriately stocked and equipped. <br /> EOC activation time in all cases will average less than 120 minutes. <br /> . <br /> . <br /> SF; <br />
The URL can be used to link to this page
Your browser does not support the video tag.