<br /> ('II' Discussion . <br /> I/J X/2007 <br /> Page 6 <br /> changcs have bccn made to the schedulc that was presented at the July work session. <br /> Staff will continually evaluate thc condition of all pieccs of equipment to prevent the <br /> purchase of equipment that docs not yet need replaccment. <br /> Enterprise Funds <br /> A utility rate study \vas perfl.mned in 2004, however, the information used in this study <br /> was incompletc, which, in tum, did not provide the most accurate results. Bascd on the <br /> factors described below, Council may want to consider updating the current utility rate <br /> study in 2007. <br /> ~ani tar"y Sewer --.f ~1I1~1 <br /> I&t The (,ity was not aware of the surcharges Met Council would impose on <br /> citics that had an excess flow of inflow and infiltration at the time of the utility <br /> ratc study. Staff will apply for credit fl.)r work to be done each year to avoid <br /> paying the surcharge to Mct Council. However. the City will need to allocate at <br /> least $100, I 00 per year for thc next five years until it is provcn that 1&1 has becn <br /> reduced to an acceptable level. . <br /> Lilt Stations and SCADA: These projects arc still listed with the '"unassigned" <br /> projccts. The remaining four lift stations arc still functioning and can be properly <br /> maintained until the fund is healthy enough to support these project costs. <br /> Roseville is meeting with potential vendors in the very ncar future to discuss the <br /> costs and technical logistics of incorporating Arden Hills into Roseville's new <br /> SC ADA system. Staff will report infonnation to Council as it becomes available. <br /> Storm Sewer FJtnd <br /> This fund will continually bc drawn down, evcn 1I1 "lighter" PMI' years. The <br /> requirements imposed by the Rice Creek Watershcd District and the MS4 pern1it <br /> (SWpPP) f()r treating stonnwater runoff arc constantly increasing. In turn, rising <br /> construction costs arc making these requircmcnts more expensive as well. <br /> 'Jj ater _[und <br /> The O&M DepaJ1ment did some of the minor repairs listed in the watcr towcr report. <br /> included the replacement of the screen on the overflow pipe and grading around the <br /> tank's faundation. The rep0l1 rccommcnds the rcst of the repairs be completed within <br /> three years; thercf()re, thesc costs have been included in thc project list for 2008. <br /> Roseville and St. Paul rccently rcnegotiated thcir water contract. In turn. Rosevillc and <br /> Arden Hills rcnewcd their contract as well. The rate increase that rcsulted from <br /> rencgotiations \Vas not incorporated into the 2004 rate study. <br /> . <br />