My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-08-07 Full Agenda Packet
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
01-08-07-R
>
01-08-07 Full Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2007 4:46:50 PM
Creation date
2/16/2007 10:01:21 AM
Metadata
Fields
Template:
General
Document
01/08/07 Agenda Packet
General - Type
Agenda Packet
Date
1/8/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> . Connelly A venue <br /> The street exhibits moderate to severe transverse cracking and exposed pavement <br /> aggregates. Areas of the street also show signs of alligator cracking and edge <br /> deterioration. There is evidence of previous maintenancc including crack sealing <br /> and patching. ^ mill and overlay was completed on Connelly Avenue in 1995. <br /> Lametti Lane and Lametti Cirele <br /> The pavement exhibits moderate transverse and alligator cracking on both Lametti <br /> Lanc and l,ametti Circle. Some areas also show signs of more severe alligator <br /> cracking due to drainage problems. Prior maintenance ineludcs crack sealing and <br /> seal coating. <br /> Chatham A venue, from County Road E-2 to Chatham Court <br /> This segment of Chatham Avenue exhibits signs of transverse cracking, as well as <br /> alligator and edge cracking in some areas. Maintenance previously completed on the <br /> street includes crack sealing and seal coating. <br /> Royal Lane <br /> Royal Lane exhibits signs or moderate to severe alligator cracking, as well as <br /> transverse cracking and potholes. Maintenance on the street ineludes seal coating, as <br /> well as skin patches over the severely deteriorated sections of the street. <br /> . Dawn Circle East <br /> Dawn Circle East exhibits severe alligator cracking over most of the pavement <br /> surfacc. Prior maintenance includes skin patching and seal coating. City records also <br /> indicate that an overlay was completed on thc street in 1991. An overlay provides <br /> the street with a new pavement surface. In a mill and overlay, the existing surface is <br /> ground off and replaced with new pavement, correcting issues with the old <br /> pavement surface and creating a structural improvement. <br /> Briarknoll Circle and Briarknoll Drive <br /> Sections of Briarknoll Circlc and Briarknoll Drive show signs of cracking, some <br /> edge deterioration and moderate to severe alligator cracking. Previous maintenance <br /> on the street ineludcs crack sealing and seal coating. Both streets also received a <br /> 1 S' overlay in 1993. An overlay provides the street with a new pavement surface. <br /> In a mill and overlay, the existing surfacc is ground off and replaced with new <br /> pavement, correcting issues with the old pavement surface and creating a structural <br /> improvcment. <br /> Karth Lake Circle <br /> The street exhibits signs of cracking and potholing. The street section just east of <br /> Hamline Avenue received a skin patch due to extremc deterioration of the <br /> pavement. Other prior maintenance includes crack sealing and seal coating. In 1993, <br /> . the street was paved with a 1 S' overlay. An overlay provides the street with a new <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.