<br /> Royal Lane . <br /> The existing condition of the majority of the pavement on this street indicates a structural failure, <br /> which would typically call for a complete reconstruction. However, since the existing concrete <br /> curb and gutter is generally in good condition, staff recommends a full depth pavement <br /> replacement. The entire section of bituminous pavement will be removed, which will allow for <br /> the subgrade to be examined, identifYing areas that need additional correction. The recommended <br /> pavement section is 3.5 inches of bituminous over the existing subgrade. <br /> Dawn Circle East <br /> The existing condition of the pavement indicates a structural failure of the street, which would <br /> typically call for a complete reconstruction. However, since the existing concrete curb and gutter <br /> is generally in good condition, staff recommends a full depth pavement replacement. The entire <br /> section of bituminous pavement will be removed, which will allow for the subgrade to be <br /> examined, identifYing areas that need additional correction. The recommended pavement section <br /> is 3.5 inches of bituminous over the existing subgrade. <br /> Briarknoll Circle and Briarknoll Drive <br /> The existing condition of a majority of the pavement on this street indicates a structural failure, <br /> which would typically call for a complete reconstruction. However, since the existing concrete <br /> curb and gutter is generally in good condition, staff recommends a full depth pavement <br /> replacement. The entire section of bituminous pavement will be removed, which will allow for <br /> the subgrade to be examined, identifYing areas that need additional correction. The recommended . <br /> pavement section is 3.5 inches of bituminous over the existing subgrade. While not all areas of <br /> Briarknoll Circle and Briarknoll Drive area exhibiting severe distress, staff recommends the full <br /> depth replacement along the entire segment for continuity purposes, to ensure that the entire <br /> street section is uniform. <br /> Karth Lake Circle <br /> The existing bituminous pavement is in need of reinforcement. Therefore, staff recommends that <br /> the street be milled to a depth of2 inches and fortified with a 2 inch bituminous overlay. By <br /> preserving the existing curb lines along this segment, the new vertical alignment will <br /> approximate the inplaee alignment. Areas exhibiting more severe signs of distress will be <br /> patched; the entire pavement section will be removed, and any necessary corrections to the <br /> subgrade will be made prior to paving the overlay. <br /> EXISTING UTILITY CONDITIONS <br /> Public utilities located within the proposed project areas include City water, storm sewer, and <br /> sanitary sewer. Private utilities inelude Xce1 gas and electric, telephone, and cable TV. <br /> Watermain <br /> The following is a table of the existing watermain with information on pipe size, material and history <br /> ofwatennain breaks over the last to years. <br /> . <br /> 19 <br />