<br /> Storm Sewer <br /> All of the streets under consideration have existing storm sewcr. However, some of the . <br /> structure castings have deteriorated or been damaged by snow plows and need replacement. <br /> The Public Works stafThas reviewed all catch basins and manholes in the proposed project <br /> areas to identify structures needing repairs or replacement. <br /> PROPOSED UTILITY IMPROVEMENTS <br /> The existing manholes, fire hydrants, gate valves, and other similar structures will be <br /> adjusted and repaired as nccessary as part of this project. The cost of any underground utility <br /> improvemcnts will be excluded from the assessable portion ofthe project and financed by the <br /> appropriate utility fund. Casting replacements or repairs are considered part of the street <br /> improvements and are not charged to individual utility funds. <br /> Staff will work with other public and quasi-public utilities to coordinate other utility <br /> improvements with the street reconstruction project. <br /> Watcrmain <br /> Reviewing the history of watem1ain breaks, staff feels that there arc no areas that need <br /> complete rcplacement of water main. As a gcneral guide, watem1ain replacement should be <br /> considered when more than live breaks occur in a ten year time pcriod. <br /> Staff identified one gate valve on Brighton Way that needs replacement; this work is . <br /> recommended as a part orthis project. <br /> Sanitary Sewer <br /> After revicwing the sanitary sewer video tapes, one segment of pipe was identified that needs <br /> repair. Approximately 30 feet of sanitary sewer pipe along Briarknoll Circle has cracked and <br /> is sagging, and needs replacement. Other minor cracks were noted, however, these are pipe <br /> segments that could be repaired using trench less technologies, such as pipe lining. City staff <br /> will be working on a separate pipe lining project in 2007, outside the scope ofthe PMP. <br /> Storm Sewer <br /> Some of the existing storm sewer structures are in need of repair. The catch basin casting on <br /> the north side of the Briarknoll Circle and Briarknoll Drive intersection will be replaced. The <br /> high flow inlet structure in the cui de sac on Lametti Lane also needs rcpair. <br /> At the ncighborhood meeting, a resident raised a question about making improvements to the <br /> existing storm sewer to improve the water quality in Karth l,ake. Staff is currently exploring <br /> options and reviewing requiremcnts for the Riec Creek Watershed District. One possibility <br /> would be to construct an in-line storm water treatment structure. Prices for these structures <br /> typically range anywhere from $25,000 to $50,000: the budgeted amount in the Stom1 Sewer <br /> Fund is $20,000. Staff will continue to gather more information in order to provide a <br /> recommendation to City Council at thc Public Hcaring. . <br /> 21 <br />