My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-07 Item 4F, Arnt Construction Change Order 3
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
03-12-07-R
>
03-12-07 Item 4F, Arnt Construction Change Order 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2007 3:43:35 PM
Creation date
3/9/2007 4:14:27 PM
Metadata
Fields
Template:
General
Document
03-12-07 Item 4F, 06 PMP Project Change
General - Type
Agenda Item
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CHANGE ORDER NO.3 <br /> <br />URS Ccpy <br />"c:+!r,..,~" <br />f" .'-.1 V'.'~":i <br />CDn-iractof Copy <br />~fjSP:-:'Gto~_' <br /> <br />Project: 2006 Pavement Management Program <br /> <br />URS Job No.: 31809837 <br /> <br />Owner: <br /> <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills. MN 55112 <br /> <br />Date of Issuance: February 26, 2007 <br /> <br />Contractor: <br /> <br />Arnt Construction, Inc, <br />P,O, Box 549 <br /> <br />Hugo, MN 55038 <br /> <br />Eugineer: URS Corporation <br />Thresher Square Building <br />700 Third Street South <br />Minneapolis, MN 55415 <br /> <br />Description of Chanl!:e Order: <br />The contract is hereby modified to include additional quantities and additional work items for Roadway, Storm Drainage, <br />Watermain, and Sanitary Sewer associated with the 2006 Pavement Management Program, The Contract Items where <br />additional quantities were needed to complete construction include; subgrade excavation, select granular borrow, <br />aggregate base CL 5, modular block retaining wall, raingarden excavation, special walk, and sodding, Also, during <br />construction, there were modifications to proposed storm sewer, existing sanitary sewer, and existing watermain that were <br />deemed necessary due to unforeseen field conditions, More detail regarding these Contract Items and the utility <br />modifications for this Change Order is provided in the Attachment to Change Order No, 3, <br /> <br />Chanl!:e Order Summary: <br />Schedule A - Roadway <br />Schedule B - Storm Drainage <br />Schedule C - Watermain <br />Schedule D - Sanitary Sewer <br />Total Contract Modification for Change Order No.3 <br /> <br />$62,629,44 <br />$17,585.26 <br />$10,892.59 <br />$15.370.17 <br />$106,477.46 <br /> <br />Contract Summary: <br />Original Contract Amount: <br />Contract Modifications to Date: <br />Current Contract Amount: <br />Contract Modifications Change Order No.3: <br />Revised Contract Amount: <br /> <br />$1,808,584.32 <br />($105,270.16) <br />$1,703,314.16 <br />$106.477.46 <br />$1,809,791.62 <br /> <br />There will be no changes in the Contract time as a result of these revisions, <br /> <br /> <br />Agreed to: <br /> <br /> <br />By: <br /> <br />By: <br /> <br />Arnt Construction, Ioe. <br /> <br />Approved By: <br /> <br />City of Arden Hills <br />
The URL can be used to link to this page
Your browser does not support the video tag.