My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-07 Item 7A1, Resolution 07-36 Tony Schmidt Park Master Plan
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
03-12-07-R
>
03-12-07 Item 7A1, Resolution 07-36 Tony Schmidt Park Master Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2007 3:45:28 PM
Creation date
3/9/2007 4:18:06 PM
Metadata
Fields
Template:
General
Document
03-12-07 Item 7A1, Res 07-36
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
View images
View plain text
<br />The develDpment concept in this regional park master plan (see Development <br />Concept Map) is consistent with the 1998 master plan. Completion of the trail <br />system will be the fDCUS of future development. The table below summarizes the <br />existing and proposed trail lengths. A future trail connection to Long Lake Regional <br />Park Dne-half mile away is planned. <br /> <br />BITUMINOUS TRAILS <br />Existing within picnic area <br />Proposed main nDrth-south trail <br />Lake JDhanna Blvd. To Co. Rd. E-2 <br />Co. Rd. E-2 to Lake Valentine Rd. <br />Proposed off road Lake Johanna Blvd. <br />TOTAL PAVED TRAILS <br /> <br />UNPAVED TURF TRAILS <br />Existing <br />West Farrel's Lake 10Dp <br />TOTAL UNPAVED TRAILS <br /> <br />LENGTH <br />1. 0 mile <br /> <br />0.7 mile <br />0.7 mile <br />0.6 mile <br />3.0 miles <br /> <br />0.6 mile <br />0.8 mile <br />1. 4 miles <br /> <br />The future recreation development area in the southwest corner of the park is a lower <br />priority. The residential in-holding (Parcel #1) will have to be acquired and the yard <br />waste site relocated before this area is available fDr development. RecreatiDnal <br />development in this area will include a grDUp picnic area, disk golf, winter sledding <br />and day camp. The following development CIP lists 2006 costs and timing/priority: <br /> <br />PriDritv <br />1 <br /> <br />2 <br /> <br />3 <br /> <br />4 <br /> <br />5 <br /> <br />Proiect <br />Pave the north-south bituminous <br />trail from Lake Johanna Boulevard to <br />CDunty Road E-2. <br />CDnstruct the north-south bituminous <br />trail, including bridges/bDardwalk Dn <br />the east side of Farrel's Lake wetland <br />complex from County Road E-2 to <br />Lake Valentine Road (Mounds View <br />High School). <br />Construct non-paved trail, including <br />bridges, on the west side of Farrel's <br />Lake wetland complex. <br />Construct off-road paved trail along <br />the north side of Lake Johanna Blvd. <br />Construct the sDuthwest recreatiDn <br />area: parking lot, restrooms, grDup <br />picnic area, disk golf, day camp. <br /> <br />TOTAL <br /> <br />Cost (2006 dollars) <br />$ 150,000 <br /> <br />$ 500,000 <br /> <br />$ 450,000 <br /> <br />$ 500,000 <br />$1,000,000 <br /> <br />$2,600,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).