My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-07 Item7C1&2, Feasibility Report for 2008 PMP
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
03-12-07-R
>
03-12-07 Item7C1&2, Feasibility Report for 2008 PMP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2007 3:46:46 PM
Creation date
3/9/2007 4:23:19 PM
Metadata
Fields
Template:
General
Document
03-12-07 Item 7C1 & 7C2, 08 PMP Feasibil
General - Type
Agenda Item
Date
3/12/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2008 PMP-Street Reconstruction Project <br /> <br />Page 3 of 4 <br /> <br />information will be used for the project and will be included into City's overall utility <br />database. Construction surveying will include a layout ofthe centerline of roadway, All <br />survey information will be based upon the Ramsey County Coordinate System in order to <br />allow easy correlation with City GIS mapping information, <br /> <br />ESTIMATED COSTS <br />We propose that the basic services identified above be completed based on actual time spent on <br />reconstruction project development and execution. We estimate that the engineering costs will <br />be 16% of the project cost. Billing for these hours will be consistent with the terms of our Joint <br />Powers Agreement for engineering services. The budgeted construction costs for the project <br />include approximately $1,007,430 of roadway improvements, $500,000 in storm drainage <br />improvements, $15,000 in sanitary improvements, and $200,000 in watermain improvements, <br />The current estimate of the total construction costs for the project is approximately $1,722,430. <br /> <br />Estimated Engineering Fees <br />The estimated cost for engineering services on this project is $275,600. The City of <br />Roseville will bill the City of Arden Hills based on actual time spent (1.9 multiplier). <br />Our standard construction agreement should be executed detailing these services prior to <br />proceeding with project development. <br /> <br />Direct Expenses <br />Direct expenses for the project include items such as mileage, parking, printing, and <br />delivery services, We may also need outside consulting services such as geotechnical, <br />registered land surveyor, and hydrologic design, Current anticipated expenses include a <br />geotechnical consultant ($2,000), printing and distribution of plans and specifications <br />($1,500), construction materials testing ($4,000), and mileage ($2,000), The total <br />estimated amount for direct expenses is $9,500, Approval of additional consulting <br />services will be obtained prior to work being completed. <br /> <br />Breakdown Engineering Services <br />We estimate that the following will be the breakdown of time spent executing the <br />different stages of Project Development. This is based on past reconstruction projects, <br />300 General Engineering 10% $27,560,00 <br />301 Inspection 24% $66,144,00 <br />302 Surveying (pre- construction) 10% $27,560.00 <br />303 Surveying (construction) 10% $27,560,00 <br />305 Feasibility study 20% $55,120.00 <br />305 Design 26% $71,656,00 <br />Direct Expenses $9,500 <br />Total $285,100.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.