My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-07 Item7C1&2, Feasibility Report for 2008 PMP
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
03-12-07-R
>
03-12-07 Item7C1&2, Feasibility Report for 2008 PMP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2007 3:46:46 PM
Creation date
3/9/2007 4:23:19 PM
Metadata
Fields
Template:
General
Document
03-12-07 Item 7C1 & 7C2, 08 PMP Feasibil
General - Type
Agenda Item
Date
3/12/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2008 PMP <br />Page 2 <br /> <br />At the January 29,2007 the City Council approved a Construction Agreement with the City of <br />Roseville for the reconstruction of Ridgewood Road and Asbury Avenue from the city limits to <br />Glenhill Road. The only modification to the approved agreement is the addition of more streets <br />to the project as shown in Exhibit A which is attached. <br /> <br />FINANCIAL IMPLICATIONS <br /> <br />The estimated project costs are $1,722,430, which were included in the 2007-2011 CIP approved <br />by the City CounciL Engineering services for this project are estimated to be $275,600, <br /> <br />Contracting with the City of Roseville to complete these engineering services should provide <br />additional cost savings during plan preparation and construction, Roseville's estimated <br />engineering costs are 16% of the total project. URS has had engineering costs around 21 % on <br />past projects. The project, if completed by URS, would have additional project costs for <br />Roseville engineering staff to review and oversee the work, If Roseville engineering staff <br />prepares the feasibility report, plans and specifications, these review costs are included as a part <br />of the proposaL <br /> <br />RECOMMENDED COUNCIL ACTION <br /> <br />It is recommended that the Council authorize preparation of the feasibility report and approve the <br />amended construction agreement with the City ofRoseville for the 2008 PMP Improvements, <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.