My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-26-07 Item 4C, Planning Case 07-004 Site Plan Agreement for 3900 Bethel Drive
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
03-26-07-R
>
03-26-07 Item 4C, Planning Case 07-004 Site Plan Agreement for 3900 Bethel Drive
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2007 3:50:26 PM
Creation date
3/23/2007 9:33:02 AM
Metadata
Fields
Template:
General
Document
03-26-07 Item 4C, PC 07-004
General - Type
Agenda Item
Category
Planning Case 07-004
Addressee
3900 Bethel Drive
Date
3/26/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e. Identify roof drain discharge locations on the plans. <br />f. On sheet C1.1- Removals Plan, one of the trees north of the <br />Clauson Center is marked as a tree to be removed; however the <br />notation calls out for tree protection. Please make corrections as <br />appropriate. <br />g. Any retaining walls greater than four feet in height will need to be <br />designed by a certified engineer. <br />h. Retaining walls four feet in height and taller will require railings for <br />safety purposes. <br />i. On sheet C1.4- Utility Plan, there are two annotations for the storm <br />sewer pipe from ST MH101 to the existing ST MH. Please verify <br />that all storm sewer and sanitary sewer pipes are labeled with <br />correct pipe size, material, length and grade. <br />j. On sheet C1.4- Utility Plan, a provision should be made in the plans <br />that insulation may be required for the watermain proposed parallel <br />to the retaining wall (by rain garden #1) as directed by the engineer <br />in the field. <br /> <br /> <br />H. The applicant shall obtain all necessary permits from the Rice Creek <br />Watershed District, MPCA, and other governmental entities and provide <br />the City with copies of such permits prior to the City issuing any building <br />permits. <br /> <br />I. The applicant shall supply the required number of ADA accessible <br />parking spaces prior to the issuance of the occupancy permit for the <br />University Commons. <br /> <br />J. The applicant shall provide updated building footprint, impervious <br />coverage, and total building square footage data prior to any new <br />building proposals at the campus. <br /> <br />Dated: _ day of <br /> <br />,2007. <br /> <br />CITY OF ARDEN HILLS <br /> <br />By: <br /> <br />Stanley Harpstead <br />Its: Mayor <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.