Laserfiche WebLink
<br />Medtronic Term Sheet <br />January 17,2006 <br />Page 2 <br /> <br />8. If the buyout alternative has to be undertaken for the billboards, Medtronic will pay all costs <br />associated with this (buyout option would be initiated if the City approved relocation sites and <br />Clear Channel chooses not to relocate to them). It is anticipated that up to three billboards will <br />fall under this option since one site (Sysco) has been approved by the City for location of a <br />billboard. If we are to assume that all three will need to be bought out, the cost associated with <br />this is $2,475,000 ($825,000 per billboard). As noted in the original Agreement, Medtronic was <br />responsible to buyout the 15t two billboards and the City was responsible for any billboards <br />above and beyond the 15t two. This request increases Medtronic's contribution by $825,000, if <br />three billboards need to be bought out, and by $1,650,000 if four need to be bought out (they <br />don't pursue the Sysco site). Medtronic is of the opinion that Clear Channel should relocate a <br />billboard to the Sysco site and that this should be pursued at all costs. They agree that if <br />MNDOT doesn't approve a permit, then they will pay the cost to buyout the sign (assumes that <br />they have to buyout 4 s,j~s). O\'c~~a,ll,they would like to ke€JP theacq,!isition, tel 3 signs rather <br />than 4, so i.f another sit~iij~~~ppro$~~r{~4(C~ear Char,mel rel~f~t~~;6~e?tthe:4 signs, then ifin <br />the alternative they h;v(j'$()91w 0l),tpj9t4ers1gns, theY are okaY;:-Ylt4;tha!,'C_ ; _ <br />.- - ,:t?{~~';)' ~i~\ f:~N~~L~:{~:~:"~-}~:: ; ":..- : :':!~~j:~': :',:::. ,:':'-< -', .- :':::::i:, _:.:;: ~;.: <br />9. Costs associated withc,1jt5;At'~~ancj,~,,*7 abqye willreiJ,nire Me!i1mnic to "pay an additional $1.1 <br />million in costs, rather;' th~#l,awj' th~C-ity p~y'iiiem arld');leducting tl)-is amount from the <br />available TIF. If they have:t.,~jpaY,1;be $82-,>,000 in'costs outllned in #8 <!hove, then their total <br />costs they will contribute wi,~~~ ~1}~;!'5,O~Q. ' 'i'," fe.,"'!'; <br /> <br />':~~"" - : "','.- - - '-" "--'-':,' :-'.-":"':', -; : - .-. <br />10. Medtronic will pay tp;brini}~ e;ll\'#Il-into working C6mplilli;JCli(;fef use at a cost of $545,000. <br />This increases their'IjIF asslS'ti!nc~~~$22.545 n;rilli(JltJn liM;tlon, the City is requesting that <br />Medtronic make a Pl\YmenM~:th~1r.oadwaY reconsti:U.qtion-fUnd in the amount of $355,000 to <br />address reconstructiQIj.<and.it~l;!ic;r~~lies oPcollectoreroaas thatwere not a<l<lj:essed as part of the <br />transportation packa~e;~l1dl;l'onk,i\vill re.ceive$35MOq nior(j in TIF (tqtalof $22.9 million). <br />It is understood bY';~l1'GJ-tYi that:ti).e rewitiriir!g $355;'OOO'available inTIf will first go to <br />overruns in utility cos~s(o~ the$400,000estiIhate), Wen tiJ.:~jremaining limi)unt will go to the <br />road reconstruction fu-nd3tid is a riot to exceed number toaccOliunodate these items/costs. <br /> <br />1 L Medtronic in return will receive 95% of the available tax increment from the entire <br />development, up to the estimated to be $22.9 million (this is estimated based upon $80 sq/ft and <br />is a not to exceed number). <br /> <br />12. Tax increment assistance will be provided for the structured parking only (cost to construct <br />structured parking is estimated at $24 million). <br />