My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-22-07 Item 2B, Five Year CIP Update
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
01-22-07-WS
>
01-22-07 Item 2B, Five Year CIP Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2007 3:08:18 PM
Creation date
6/18/2007 4:45:39 PM
Metadata
Fields
Template:
General
Document
01-22-07 Item 2B, Five Year CIP Update
General - Type
Agenda Item
Date
1/22/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Deferred Maintenance Backlog <br />An important factor in evaluating budget scenarios is deferred maintenance. Deferred <br />maintenance is work that could not be done in a given year of the analysis period due to <br />lack of funding. It represents work that is delayed until additional funds can be found. <br />The monetary result of deferred maintenance is maintenance backlog. In the budget <br />analysis of this report, the maintenance backlog for a given year is defined as the cost <br />for the City to repair all the pavements in that year. <br /> <br />As the average network PCI decreases, the cost to repair pavements rises. As the <br />pavements approach the poor category, the cost of rehabilitation rises due to the large <br />amount of individual distresses that require repair. The following figure illustrates the <br />general relationship between the increasing cost of rehabilitation maintenance and <br />decreasing pavement condition for Arden Hills pavements. It is based on our <br />experience with urban pavements like those of the Arden Hills pavement network, but <br />does not use actual Arden Hills pavement data. <br /> <br />Typical City Streets <br />Maintenance Cost and Condition vs. Age <br /> <br />Pavement Condition <br /> <br />Pavement Rehab cost ($/sq. ft.) <br /> <br />100 <br /> <br />80 <br /> <br />60 <br />40 <br /> <br />20 <br /> <br />o <br /> <br /> <br />o 10 20 30 40 <br />Age of Present Surface (years) <br /> <br />Figure 4 <br /> <br />$5 <br />$4 <br />$3 <br />$2 <br />$1 <br />$- <br /> <br />As the pavements approach the poor category, the cost of rehabilitation rises sharply. If <br />preventive maintenance is not emphasized now, the bulk of the pavement network will <br />rapidly decline in condition. A considerable amount of heavy maintenance at a high unit <br />cost will be needed later to regain the original current condition of the pavement <br />network. The labor-intensive effort required for heavy spot repairs would most likely put <br />a burden on City staff. The actual cost of the deferred backlog would rise, resulting in a <br />decreasing annual average pavement condition. <br />
The URL can be used to link to this page
Your browser does not support the video tag.