My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-29-07 Item 7E, Resolution 07-27 Feasibility Report Prep Order
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
01-29-07-WS
>
01-29-07 Item 7E, Resolution 07-27 Feasibility Report Prep Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2007 3:25:41 PM
Creation date
6/19/2007 2:29:29 PM
Metadata
Fields
Template:
General
Document
01-29-07 Item 7E, Resolution 07-27
General - Type
Agenda Item
Category
Resolution 07-27 Feasibility Study
Date
1/29/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br /> <br />~ <br />EN HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />January 25, 2007 <br /> <br />AGENDA ITEM 7.E <br /> <br />TO: <br /> <br />Mayor and City Council <br />Michelle Wolfe, City Administrator <br /> <br />Kristine Giga, Civil Engineer ~ <br /> <br />FROM: <br /> <br />SUBJECT: <br /> <br />Order Feasibility Report for Asbury Avenue and Ridgewood Road <br />from City limits to Glenhill Road <br /> <br />BACKGROUND <br /> <br />The City of Arden Hills has received a request from the City of Roseville regarding its next area <br />for street reconstruction, the Asbury Avenue! Ridgewood Road neighborhood (Roseville's <br />"Neighborhood 10"). City limits are midblock; some properties are even divided by the border. <br />Roseville would like us to consider the option of extending their project up to Glenhill Road, <br />which would include approximately 300 feet of Asbury A venue and 400 feet of Ridge wood <br />Road located within Arden Hills. A letter with this request is attached. <br /> <br />DISCUSSION <br /> <br />While the Arden Hills segments of Asbury Avenue and Ridgewood Road are in better condition <br />than the Roseville segments, and there are streets in worse condition in the City, there are <br />advantages to extending this project to include the entire block. <br />· The residents along the block would only be inconvenienced once for the reconstruction of <br />their street, rather than twice, if projects are completed by each City at different times. <br />. Residents from both cities would be able to meet and be involved in decisions that would <br />affect the entire street. <br />. A more comprehensive storm sewer design could be achieved, since part of the street in <br />Roseville drains north into Arden Hills. <br />. Given the close proximity of this neighborhood to the proposed 2008 PMP, this would be <br />another good candidate for combining projects in an effort to reduce construction costs by <br />creating a more lucrative project for contractors. <br /> <br />\\Metro-inet.us\ardenhills\PR&PW\Engineering\2007\Council_ Actions\ I -29-07_ Memo _ OrderFR _ RVN I OExtension.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.