My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-16-07 Item 2G, Ice Rink Warming House Review
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
07-16-07-WS
>
07-16-07 Item 2G, Ice Rink Warming House Review
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2022 11:06:40 AM
Creation date
7/12/2007 11:29:41 AM
Metadata
Fields
Template:
General
Document
Agenda Item 2G, Ice Rink Warming House
General - Type
Agenda Item
Date
7/16/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 3 of5 <br /> <br />Attendance - Freeway Park is always one of the two top attended rinks in the City. <br />Attendance increased from 616 in 2005/2006 to 857 in 2006/2007. The building was <br />open 37 days versus 30 in 2005/2006. <br /> <br />Further maintenance needed before 2007/2008 Season - After one season of flooding <br />around the new building, the Public Works Department has identified a few areas that <br />need to be re-graded. This will be done internally at a minimal cost. <br /> <br />Hazelnut Park <br />Building Condition - The building was built in 1960. Before the 2006/2007 season <br />started, the building was in need of repairs to the ceiling, roof and outside siding. Critter <br />holes were closed up. However, since the building is not built on a concrete slab, these <br />critter holes will reappear and will need to be dealt with each fall. <br /> <br />Attendance - This rink continues to experience top attendance in the City. Attendance <br />increased from 716 in 2005/2006 to 905 in 2006/2007. The building was open 37 days <br />versus 30 in 2005/2006. <br /> <br />Further maintenance needed before 2007/2008 - If the City Council decides to maintaiu <br />the existing building, staff recommends that the building be insulated, paneled on the <br />inside, and have repairs made to the floor. The estimated cost for the Public Works <br />Department to do this is $1,000 (not including labor). <br /> <br />Option to cousider - The old building at Cununings Park has coutinually experienced <br />vandalism and has had numerous break-ins. Since it is located in a very remote area of <br />the park, it may potentially continue to have problems and the building could sustain <br />more damage as time goes on. The City Council could consider moving the building in <br />2007 or 2008 to Hazelnut Park to avoid these problems and to upgrade the old building at <br />Hazelnut. There are no funds budgeted in 2007 for this move. If and when the old <br />building at Cummings Park moves, it will need a new roof at an estimated cost of $800 <br />(not including labor) and new interior/exterior paint at $200. The following is a cost <br />estimate to move the building from Cunnnings Park to Hazelnut Park: <br /> <br />Building Tear Down -Approximately $500 for a roll off dumpster <br />Concrete Slab - Approximately $4,000 <br />Electrical Reconnect - Approximately $3,000 <br />Movement of the building - Approximately $4,500 <br />New Roof - Approximately $800 <br />Exterior Paint - Approximately $150 <br />Estimate Grand Total for move - $12,950.00 <br /> <br />\\Metro-inet.us\ardenhills\PR&PW\Parks\Memos\Council Memos\warming house Review <br />07.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.