Laserfiche WebLink
<br />Master Plan <br /> <br />. On July 2, 2007 joint meeting of the Master Plan Task Force, Planning Commission and City <br />Council, HKGI showed plans for a new concept which included more single family lots (306 <br />lots). At the July 12,2007 joint meeting it was determined that this composite plan should be the <br />concept shown at the open house. The open house was held on July 19,2007 with approximately <br />100 residents in attendance. Staff is in the process of compiling the comments for review by the <br />joint group. <br /> <br />. Next meeting with the Task Force (August 7, 2007), City Council (August I, 2007) and joint <br />meeting of the Planning Commission and City Council (August 9, 2007) will focus on financial <br />aspects of the concept plan. <br /> <br />Design Guidelines <br /> <br />. Damon Farber Associates (DF A) is currently working on parks/open space design guidelines and <br />streetscapes. Preliminary parks/open space concepts were presented at the July 19, 2007 open <br />house. DF A is meeting with City staff to gather data regarding the costs to maintain parks and <br />trails. <br /> <br />ADAR <br /> <br />. GSA and their NEPA representative met with the City and SRF on July 18, 2007 to discuss the <br />AUAR. The mitigation plan developed by the AUAR will likely be incorporated into the NEP A <br />in some form. The draft AUAR should be distributed to staff in late August. <br /> <br />. As part of the AUAR, wetland inspections were conducted and preliminary results indicate no <br />mitigation will be required. It was deterrnliled that the existing ditch wetlands do not require <br />mitigation and the four (4) small natural wetlands on the property are so small they do not require <br />mitigation. The only significant wetlands are on the Wildlife Corridor and those are in the <br />process of being reconstructed by the Army. <br /> <br />Comprehensive Plan (full update aud amendment for TCAAP) <br /> <br />. On July 30, 2007, City Council will be considering approval of an application to the Metropolitan <br />Council for a $20,000 grant to assist in updating the Comprehensive Plan. <br /> <br />. Staff sent out an RFQ (Request for Quotes) for assistance with the transportation portion of the <br />Plan update. Staff received six (6) responses and anticipates bringing a recommendation forward <br />to the City Council for review/consideration on August 13, 2007. <br /> <br />. The first public open house on the Comprehensive Plan update is scheduled for August 8, 2007 at <br />North Heights Lutheran Church from 6:30 to 8:30 pm. <br /> <br />County Road H <br /> <br />. MNDOT has given approval of the concept design. <br /> <br />. The City and RRLD have been informed there may not be a 2008 transportation bill at the federal <br />level. RRLD and lobbyists are researching to determine/find other alternative funding. RRLD <br />and lobbyists are working to determine by end of August when dollars can be committed to the <br /> <br />Project Status Memo <br /> <br />2 <br />