Laserfiche WebLink
<br />August 10, 2007 <br /> <br />Repairs Completed <br /> <br />1) Repair thru wall flashing at chimney <br />2) repair lobby ceiling <br />3) repair thru wall flashing at council conference room <br />4) Repair/adjust interior doors <br />5) Chimney recladding <br /> <br />$9,080.00 <br />$1,216.00 <br />$11,375.00 <br />$922.00 <br />$29,706.50 <br /> <br />Total of above <br /> <br />$52,299.50 <br /> <br />1) The report dated 10/22/04 by Building Restoration. An area of the building that <br />had numerous water intrusions since the building was built. <br />2) For interior repairs ofthe lobby ceiling related to the 10/22/04 report <br />3) The report dated 5/24/04 by Building Restoration. An area of the building that had <br />several water intrusions since the building was built. <br />4) This cost is for Kraus Anderson to do repairs on doors that have been a problem <br />since the building was built. <br />5) 5) For recladding chimney. First payment only <br /> <br />\\Metro.inetus\ardenhills\Building\City Hall\City Hall costs\City Hall costs\Full Document8-lO-07.doc Page 9 ofl2 <br />