<br /> Proiect Cost Estimates
<br /> Design RIW Year-of- Construction Total
<br /> Project Construction Estimate Estimate Construction Engineering Project
<br />Highway Description Program Fiscal Year ($000) ($000) Estimate Estimate Cost
<br /> ($000) ($0001 ($0001
<br />35E 1-94 to Maryland MC 2010 7,687 Limited 76,755 6,140 90,571
<br /> Ave. in 81. Paul,
<br /> grading, surfacing,
<br /> brs., etc., including
<br /> Cayuga Br. and
<br /> Phalen Blvd.
<br /> connection
<br />35W At Lake St. in MC 2009 1,160 COlltin- 11,600 928 13,688
<br /> Minneapolis, DOUS/
<br /> recons~r;~t inter- Major
<br /> chanoe h. 1)
<br />35W At Lake St. in MC 2010 1,785 Contin- 17,850 1,428 21,063
<br /> Minneapolis, DOUS/
<br /> reconstruct inter- Major
<br /> chanoe (Ph. 2)
<br />36 At Lexington MC 2009 1,380 Limited 13,804 1,104 16,289
<br /> Ave.. in Roseville,
<br /> replace Br. 5723
<br /> and reconstruct
<br /> interchaUlle
<br />100 36'" St. to Cedar MC 2011 6,150 Contin- 61,500 4,920 72,570
<br /> Lake Rd. in St. DOUS!
<br /> Louis Park, Major
<br /> grading, surfacing,
<br /> Brs., etc. for 6-lane
<br /> freeway
<br />169 Neaf CSAH 6 in MC 2010 1,904 Limited 19,040 1,523 22.467
<br /> Belle Plaine,
<br /> grading, surfacing,
<br /> Br., etc. for new
<br /> interchanlle
<br />694 E of135W in MC 2012 6,960 Minimall 69,596 5,568 82,123
<br /> Arden Hills to E of Spot
<br /> Lexington Ave.. in
<br /> Shoreview,
<br /> grading, surfacing,
<br /> Brs., etc. to add
<br /> thifd lane and
<br /> correct weave at
<br /> TH 10/51
<br /> TOTALS 27,015 270,145 21,611 318,771