Laserfiche WebLink
<br />~ <br />-~H1LLS <br /> <br />- <br /> <br />FEES <br /> <br />Bolton & Menk is familiar with a wide range of project fee structures and is prepared to work closely with <br />the City of Arden Hills to negotiate a standard fee system that addresses the needs of both the City and the <br />firm. <br /> <br />Normally, fees. for project design services will be provided on an hourly basis, with a mutually agreeable <br />total estimated fee or, when the scope of services is clearly defined, a not-to-exceed maximum limit. <br />Alternatively, when both parties are in agreement, a lump sum fee may be agreed upon for total <br />compensation. Due to contractors' control of the means, methods, timing and schedule, it is generally <br />anticipated that construction phase services will be provided on an hourly basis, with an estimated budget <br />prepared prior to construction commencement. <br /> <br />The following Schedule of Fees is based upon competent, responsible engineering and surveying services <br />and is tlle minimum, below which adequate professional standards cannot be maintained. It is, therefore, <br />to the advantage of both the Professional Engineer or Surveyor and the Client, that fees be commensurate <br />with the service rendered. <br /> <br />Hourly Billing Rates <br /> <br />Principal Engineer/Surveyor ........................................ $120-1801H0ur <br />Associate Engineer/Surveyor... ...... .................... ............ .$95-1401H0ur <br />Project/Design Engineer ................................................ $55-1301H0ur <br />Licensed Surveyor ......................................................... $70-130IHour <br />Project Surveyor .............................................................. $50-90/Hour <br />Senior Technician .......................................................... $55-120/Hour <br />Technician ....................................................................... $40-901H0ur <br /> <br />Clerica!..... ........ ............... ........... ......................... ...... ....... $30-601H0ur <br />GPS/Robotic Survey Equipment...................................... $45-60/Hour <br />AutoCAD/Computer Time...............................................No Charge <br />Office Supplies ..................................................................No Charge <br />Photo CopyinglReproduction ..........................................No Charge <br />Field Supplies/Survey Stakes & Equipmeut...................No Charge <br />Mileage...............................................................................No Charge <br /> <br />Charges for non-routine and reimbursable work are based on hours spent at hourly rates in effect for the <br />individuals performing the work. The hourly rates for Principals, Senior Associates, Associates and <br />members of the staff vary according to skill and experience. The Schedule of Fees shall apply for the <br />period through Januarv 1. 2009. These rates may be adjusted annually thereafter to account for changed <br />labor costs, inflation or changed overhead conditions. <br /> <br />Quotefor Transportation Planning Services <br />2008 Comprehensive Plan Update <br />City of Arden Hills, Minnesota <br /> <br />Section 5 - I <br />Submitted by: <br />Bolton & Menk, Inc. <br />