|
<br />,
<br />;
<br />i
<br />,
<br />1
<br />,
<br />1
<br />"
<br />!l
<br />Ii
<br />.'
<br />II
<br />,I
<br />~
<br />
<br />GENERAL NOTES
<br />
<br />1. lANDSCAPE COtnRACTOR SHALL INSPECT THE SITE AND BECOME
<br />FAMIUAR WITH EXISTING CONomON$ RELATING TO mE NATURE AND
<br />SCOPE OF WORK.
<br />2. LANDSCAPE CONTRACTOR SHALL VERIFY PLAN LAYOUT AND BRING TO
<br />THE ATTEtmON OF THE lANDSCAPE ARCHITECT DISCREPANCIES WHICH
<br />MAY COMPROMISE THE DESIGN OR INTENT OF THE LAYOUT.
<br />lANDSCAPE CONTRACTOR SHAll ASSURE COMPLWlCE WITH
<br />APPLICABLE CODES AND REGUlATiONS GOVERN!NG THE WORK AND
<br />MATERIALSSUPPUED.
<br />4. LANDSCAPE CONTRA.CTORSHALL PROTECT EXISTING ROADS,
<br />CURBS/GUTTERS, TRAILS, TREES, LAWNS AND SITE ELEMENTS DURING
<br />CONSTRUCTION OPERATIONS. DMlAGE TO SAMESHALL BE REPAIRED AT
<br />NO ADOmONAL COST TO THE OWNER.
<br />5. LANDSCAPE CONTRACTOR SHALL VERIFY AUGNMENT AND LOCATION OF
<br />UNDERGROUND AND ABOVE GRADE unLmEs AND PROVIDE THE
<br />NECESSARY PROTECTION FOR SAME BEFORE CONSTRUCTION BEGINS
<br />(MINIMUM 10' CLEARANCE).
<br />6, LANDSCAPE CONTRACTOR SHALL COORDINATE THE PHASES OF
<br />CONSTRUCTION AND PLANTING lNSTAUATlON WITH OTHER
<br />CONTRACTORS WORKING ON SITE.
<br />7. UNDERGROUND UTlLmES SHALL BE INSTALLED SO THATTRENCHES DO
<br />NOT CUT THROUGH ROOT SYSTEMS OF EXISTiNG TREES TO REMAIN.
<br />8. EXISTING CONTOURS, TRAILS, VEGETATION, CURBIGUTTERANDOTl-lER
<br />ELEMENTS ARE BASED UPON INFORMATION SUPPLIED TO Tl-lE lANDSCAPE
<br />ARCHITECT BY OTHERS. lANDSCAPE CONTRACTOR SHALL VERIFY
<br />DISCREPANCIES PRIOR TO CONSTRUCTION AND NOTIFY lANDSCAPE
<br />ARCHITECT OF SAME.
<br />S. HORIZONTAL AND VERTICAL ALIGNMENT OF PROPOSED WALKS, TRAILS OR
<br />ROADWAYS ARE SUBJECTTO FIElD ADJUSTMENT REQUIRED TO
<br />CONFORM TO LOCAl.1ZED TOPOGRAPHIC CONDITIONS AND TO MINIMIZE
<br />TREE REMOVAL AND GRADiNG. CHANGES IHALlGNMENT AND GRADES
<br />MUST BE APPROVED BY THE lANDSCAPE ARCHITECT PRIOR TO
<br />IMPLEMENTATION.
<br />10. lANDSCAPE CONTAACTOR SHALL REVlEWTl-lE SITE FOR DEFICIENCIES IN
<br />SITE CONDITIONS WHICH MIGHrNEGATlVELY AFFECT PLANT
<br />ESTABUSHMENT, SURVIVAL OR WARRANTY. UNDESIRABLE SITE
<br />CONDITIONS SHALL BE BROUGHT TO Tl-lE ATTENTION OF lliE lANDSCAPE
<br />ARCHITECT PRIOR 10 BEGINNING OF WORK.
<br />11. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR ONGOING MAINTENANCE
<br />OF NEWLY INSTALLED MATERIALS UNTIL TIME OF SUBSTANTIAL
<br />COMPLETION. REPAIR OF ACTS OF VANDALISM OROAW.GE WHICH MAY
<br />OCCUR PRIOR TO SUBSTANTIAL COMPLETION SHALL BE THE
<br />RESPONSIBILITY OF THE lANDSCAPE CONTRACTOR.
<br />12. EXISTING TREES OR SIGNIFICANT SHRUB MASSINGS FOUND ON SITE
<br />SfW.L BE PROTECTED AND SAVED UNLESS NOTED TO BE REMOVED OR
<br />ARE LOCATED IN AN AREA TO BE GRADED. QUESTIONS REGARDING
<br />EXISTING PlANT MATERIAL SHALL BE BROUGHT TO THE ATTENTION OF
<br />THE lANDSCAPE ARCHITECT PRIOR TO REMOVAL
<br />13. EXISTING TREES TO REMAIN, UPON DIRECTION OF lANDSCAPE
<br />ARCHITECT, SHALL BE FERTILIZED AND PRUNED TO REMOVE DEAD WOOD,
<br />DAMAGED AND RUBBING BRANCHES.
<br />14. lANDSCAPE CONTRACTOR SHALL PREPARE AND SUBMIT A WRITTEN
<br />REQUEST FOR Tl-lE SUBSTANTIAL COMPLETION INSPECTION OF
<br />lANDSCAPE AND SITE IMPROVEMENTS PRIOR TO SUBMlmNG FINAL PAY
<br />REQUEST.
<br />15. LANDSCAPE CONTRACTOR SHALL PREPARE AND SUBMIT REPRODUCIBLE
<br />AS-BUILT DRAWING(S) OF LANDSCAPE INSTALlATION, IRRIGATION AND
<br />SITE IMPROVEMENTS UPON COMPLETlON OF CONSTRUCTION
<br />INSTALtATlON AND PRIOR TO SUBSTANTIAL COMPLETION.
<br />
<br />GRADING NOTES
<br />
<br />1. ROUGH GRADING AND FINISHED GRADING TO BE DONE BY OTl-lERS
<br />EXCEPT WHERE NOTED,
<br />GRADING UMITS ARE DEFINED AS THE JUNCTURE OF PROPOSED GRADE
<br />WITH EXISTING GRADE UNLESS NOTED OTHERWISE.
<br />3_ GRADING UMITS AND UMITS OF WORK SHOWN ON PLAN ARE ONLY
<br />APPROXIMATE AND MAY BE ADJUSTED IN F1ELD BY lANDSCAPE
<br />ARCHITECT. WORK OUTSIDE OF THESE LIMITS WILL BE OONEAT
<br />LANDSCAPE CONTRACTORS EXPENSE UNLESS DIRECTED BY lANDSCAPE
<br />ARCHITECT OR OWNER IN WRITING.
<br />4. FILUCUT AS NECESSARY TO PROVIDE A 1%%% MINIMUM GRADE AWAY
<br />FROM BUILDINGS WITHIN UMITS OF CONSTRUCTION.
<br />
<br />SCHEMA TIC LANDSCAPE PLAN
<br />
<br />5. SALVAGE TOPSOIL FROM THE EAATHWORKAREASASAPPROPRIATE OR
<br />AS DIRECTED BY LANDSCAPE ARCHITECT AND STOCKPILE FOR REUSE IN
<br />LOCATION APPROVED BY OWNER
<br />6. MAINTAIN A UNIFORM GRADE BETWEEN CONTOURS IN AREAS TO BE
<br />GRADED UNLESS NOTED OTl-lERWlSE.
<br />ELEVATIONS, IF SHOWN ARE FINISHED ELEVATIONS. SPOT ELEVATIONS
<br />TAKE PRECEDENCE OVER CONTOURS.
<br />8. ADD EROSION CONTROL MEASURES IF GRADES GREATER THAN 3:1 OR IF
<br />CONDITIONS WARRANT. REFER TO MNDDT SPECIFICATIONS FOR EROSION
<br />CONTROL.
<br />9. lANDSCAPE CONTRACTOR SHALL CONTACT PUBUC UTILITIES FOR
<br />LOCATION OF UNDERGROUND WIRES, CABLES, CONDUITS, PIPES,
<br />MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING.
<br />lANDSCAPE CONTRACTOR SHALL REPAIR OR REPLACE Tl-lE ABOVE IF
<br />DAMAGED DURING CONSTRUCTION AT NO ADDITIONAl. COST TO ruE
<br />OWNER
<br />10. LANDSCAPE CONTRACTOR SHALL PROVIDE PROPER EROSION CONTROL
<br />MEASURES AS REQUIRED TO INSURE THAT EROSION IS KEPTTO AN
<br />ABSOLUTE MINIMUM.
<br />11. PROVIDE TEMPORARY COVERING FOR CATCH BASINS AND MAN HOLES
<br />UNTIL FINISHED GRADING IS COMPLETE.
<br />12 CONTRACTOR SHAlL CONSTRUCT DRAINAGE BASINS AS NEEDED.
<br />13 PERIMETER SILT FENCE AND ROCK CONSTRUCTION ENTRANCES SHALl BE
<br />INSTALLED PRIOR TO CONSTRUCTION. REFER TO MNDDT SPECIFICATIONS
<br />FOR AGGREGATE BASE AND SILT FENCE.
<br />14. CONTRACTOR SHAlL INSTALL CATCH BASIN EROSION CONTROL
<br />MEASURES PER MPCA (MINNESOTA POLLUTION CONTROL AGENCY)
<br />SPECS.
<br />15. WITHIN TWO WEEKS OF RNISHED SITE GRADING, DISTURBED AREAS
<br />SfW.LBE STABILIZED WITH SEED, SOD, MULCH OR ROCK BASE.
<br />16. CONTRACTORSHALl MAINTAIN EROSION CONTROL MEASURES,
<br />INCLUDING Tl-lE REMOVAL OF ACCUMULATED SILT IN FRONT OF SILT
<br />FENCES AND EXCESS SEDIMENT IN PROPOSED CATCH BASINS, FOR THE
<br />DURATION OF CONSTRUCTION.
<br />17. LANDSCAPE CONTRACTOR SfW.L REMOVE EROSION CONTROL MEASURES
<br />AFTER VEGETATION IS ESTABliSHED AND DISPOSE OF OFF SITE.
<br />
<br />PLANTING NOTES
<br />
<br />NO PLANTS WILL BE INSTALLED UNTIL FINAL GRADING AND
<br />CONSTRUCTION HAS SEEN COMPLETED IN THE IMMEDIATE AREA.
<br />2. PROPOSED PlANT MATERIAL SHALL COMPLY WITH THE CURRENT EDITION
<br />OF THE AMERICAN STANDARD FOR NURSERY STOCK, ANSl Z60,l, UNLESS
<br />NOTED OTl-lERWISE, DECIDUOUS SHRUBS SHAl.L HAVE ATlEAST 5 CANES
<br />AT THE SPECIFIED HEIGKT. ORNAMENTAL TREES SHALl HAVE NOV
<br />CROTCHES AND SHAll. BEGIN BRANCHING NO LOWER THAN 3' FEET
<br />ABOVE THE ROOT BALL. STREET #10 SOULEVARO TREES SfW.L BEGIN
<br />BRANCHING NO LOWER THAN 6' ABOVE PAVED SURFACE.
<br />3. PlANT SYMBOLS ON PlAN DRAWiNG TAKES PRECEDENCE OVER PLANT
<br />SCHEDULE IF DISCREPANCIES IN QUANTITIES EXIST. SPECIFICATIONS
<br />AND DETAILS TAKE PRECEDENCE OVER NOTES.
<br />4. PROPOSED PLANT MATERIAl. SHALL BE LOCATED AND STAKED AS SHOWN
<br />ON PlAN. lANDSCAPE ARCHITECT MUST APPROVE STAKlNG OF PlANT
<br />MATERIAL PRIOR TO DIGGING.
<br />5. NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS
<br />APPROVAL IS GRANTED BY lliE lANDSCAPE ARCHITECT TO THE
<br />LANDSCAPE CONTRACTOR PRIOR TO THE SUBMISSION OF BID.
<br />6. ADJUSTMENTS IN LOCATION OF PROPOSED PlANT MATERIALS MAYBE
<br />NEEDED IN FIELD. LANDSCAPEARCI'lITECT MUST BE NOTIFIED PRIOR TO
<br />ADJUSTMENT OF PlANTS.
<br />7. PLANT MATERIALS TO BE INSTALLED PERPlANTlNG DETAILS.
<br />8. PlANT MATERIAL SfW..L BE FERTlUZEO UPON INSTALlATION WITH DRIED
<br />BONE MEAL, OTHER APPROVED FERTIUZER MIXED IN WITH THE PLANTlNG
<br />SOIL PER THE MANUFACTURER'S INSTRUCTIONS OR MAY BE TREATED FOR
<br />SUMMER AND FAlL INSTALtATlON WITH AN APPlICATION OF GRANUlAR
<br />1(}..O.5 OF 12 or. PER 2.5" CALIPER TREE AND 6 oz. PER SHRUB WITH AN
<br />ADDITIONAL APPLICATION OF 10-0-10 THE FOLLOWING SPRING IN Tl-lE
<br />TREE SAUCER.
<br />9. PlANTING AREAS RECEIVING GROUND COVER, PERENNIALS, ANNUALS OR
<br />VINES SfW.L RECEIVE A MINIMUM OF 12" DEPTH OF PlANTING SOIL
<br />CONSISTING OF 45 PARTS TOPSOIL, 45 PARTS SCREENED COMPOST AND
<br />10 PARTS SAND OR AS OTHERWISE SPECIFIED.
<br />10 TREE WRAPPING MATERIAL SHALL BE TWO-WALLED PtASTIC SHEETING
<br />APPLIED FROM TRUNK FLARE TO FIRST BRANCH. WRAP SMOOTH-BARKED
<br />DECIDUOUS TREES PLANTED IN Tl-lE FAlL PRIOR TO DECEMBER 1 AND
<br />REMOVE WRAPPING AFTER MAY 1.
<br />
<br />11, 3f16"THICKSTEa EDGER TO BE USED TO CONTAIN SHRUBS, PERENNIALS
<br />AND ANNUALS WHERE PlANTING BED MEETS SOD UNLESS OTHERWISE
<br />NOTED.
<br />12. ANNUAL AND PERENNIAL PlANTING BEDS TO RECEIVE 3' DEEP SHREDDED
<br />HARDWOOD MULCH Wlll-I NO WEED BARRIER.
<br />13. SHRUB BED MASSINGS TO RECEIVE 4" OEEP SHREDDED HARDWOOD
<br />MULCH Wlll-I FIBER MAT WEED BARRIER
<br />14. CONIFEROUS TREES ARE TO RECEIVE 4' OEEP SHREDDED HARDWOOD
<br />MULCH #10 SHALL HAVE NO MULCH IN DIRECT CONTACT WITH THE TREE
<br />TRUNK
<br />15. MAINTENANCE STRIPS, WHERE ILLUSTRATED, TO HAVE EDGER AND
<br />MULCH AS INDICATED ON DRAWiNGS OR IN SPECIFICATIONS.
<br />16. lANDSCAPE COmRACTORSHALL WARRANTY NEW PLANT MATERIAL
<br />THROUGH ONE CALENDAR YEAR FROM Tl-lE DATE OF SUBSTANllAL
<br />COMPLETION. NO PARTIAL ACCEPTANCE WILL BE CONSIDERED.
<br />17. UNLESS NOTED OTHERWISE, THE,APPROPRIATE OATES FOR SPRING
<br />PLANT MATERIAL INSTALlATION IS FROM THE TIME GROUND HAS THAWED
<br />TO JUNE 15.
<br />16, CONIFEROUS PlANTING IS ACCEPTABLE FROMAUGUST15 TO OCTOBER 1.
<br />FALL DECIDUOUS PlANTING IS ACCEPTABLE FROM THE FIRST FROST
<br />UNTIL NOVEMBER 15. ADJUSThlENTS TO PlANTING DATES MUST BE
<br />APPROVED IN WRITlNG BY THE lANDSCAPE ARCHITECT,
<br />
<br />IRRIGATION NOTES
<br />
<br />1. LANDSCAPE CONTRACTOR SHA1LBE RESPONSIBLE FOR PROVlDING AN
<br />IRRIGATION tAYOUT PLAN AND SPECIFICATION AS PART OF lliE SCOPE OF
<br />WORK. SUBMIT lAYOUT PLAN AND SPECIFICATIONS FOR,APPROVAL BY
<br />THE lANDSCAPE ARCHITECT PRIOR TO ORDER AND/OR CONSTRUCTION.
<br />IT SHALL BE THE lANDSCAPE CONTRACTOR'S RESPONSIBILITY TO INSURE
<br />THAT SODDEOISEEDED AND PLANTED AREAS ARE IRRIGATED PROPERLY,
<br />INCLUDING Tl-lOSE AREAS OIRfClt Y AROUND AND ABlJTTING BUILDING
<br />fOUNDATION.
<br />2. LANDSCAPE CONTRACTORSHALl VERIFY (EXISTING) IRRIGATION SYSTEM
<br />tAYOUT ANDCONFIRM COMPLETE LIMITS OF IRRIGATION PRIOR TO
<br />SUPPLYING SHOP DRAWINGS.
<br />3. LANDSCAPE CO~CTORSHALl PROViDE THE OWNER WITH AN
<br />IRRIGATION SCHEDULE APPROPRIATE TO THE PROJECT SITE CONDITIONS
<br />AND TO PLANTED MATERIAL GROWTH REQUIREMENTS.
<br />4. lANDSCAPE CONTRACTORSHALL INSURE THAT SOIL CONDITIONS AND
<br />COMPACTION ARE ADEQUATE TO AlLOW FOR PROPER DRAINAGE
<br />AROUND THE CONSTRUCTION SITE. UNDESIRABLE CONDITIONS SHALL BE
<br />BROUGHT TO Tl-lE ATTENTION OF THE lANDSCAPE ARCHITECT PRIOR TO
<br />BEGINNING OF WORK IT SHALl BE THE LANDSCAPE CONTRACTOR'S
<br />RESPONSIBILITY TO INSURE PROPER SURFACE AND SUBSURFACE
<br />DRAINAGE IN PlANTING AREAS,
<br />
<br />TURF NOTES
<br />
<br />t SOD AREAS DISTURBED DUE TO GRADING UNLESS NOTED OTl-lERWISE.
<br />2, WHERE SOD ABUTS PAVED SURFACES, FINISHED GRADE OF SODISEED
<br />SHALL BE HELD 1" BELOW SURFACE ELEVATION OFTRAlL, SLAB, CURB,
<br />ETC.
<br />SOD SHAlL BE LAID PARALLEL TO THE CONTOURSANDSfW.L HAVE
<br />STAGGERED JOlNT5. ON SLOPES STEEPER THAN 3:1 OR IN DRAINAGE
<br />SWALES, SOD SHALL BE STAKED SECURELY,
<br />4, UNLESS NOTED OTHERWlS~ THE,APPROPRlATE DATES FOR SPRING SEEO
<br />& SOD PlACEMENT IS FROM THE TIME GROUND HAS THAWED TO JUNE 15.
<br />5. FALL SODDING IS GENERALLY ACCEPTABLE FROM AUGUST 15 TO
<br />NOVEMBER 1, FALL SEEOING IS GENERALLY ACCEPTABLE FROM AUGUST
<br />15TO SEPTEMBER 15. ADJUSTMENTS TO SOD/SEED PLANTING DATES
<br />MUST BE APPROVED IN WRITING BY THE LANDSCAPE ARCHITECT.
<br />
<br />PREPARE SOIL FOR
<br />THE ENTIRE BED
<br />
<br />NOTE:
<br />SEESPECIFICAT!ONSECTlON
<br />RElATED TO EXTERIOR PlANTING
<br />
<br />3'MULCH. DO NOT PlACE MULCH
<br />IN CONTACT WITH PLANT STEM
<br />EDGE CONDITION VARIES, SEE PLAN
<br />EOGING,SEEPLAN
<br />CONmNERG~~MATE~SHAlL
<br />HAVE ROOTS HAND LOOSENED
<br />PlANTING SOIL FOR PERENNIALS
<br />SCARlFYSIDES AHD BOTTOM OF
<br />ENTIRE BED WITH SPADE BY HAND
<br />TO BINO WlTl-l PlANTING SOIL
<br />UNDISTlJRBEDSUBGRADE
<br />
<br />
<br />1
<br />l100
<br />
<br />PERENNIAL PlANTING DETAIL
<br />
<br />SCALE:314'.l'.{I'
<br />
<br />?l.NmNGDETIlJ
<br />
<br />'/C<",,-,;}WG
<br />
<br />2
<br />L100
<br />
<br />SHRUB PLANTING DETAIL
<br />
<br />NOTE:
<br />SEE SPECIFICATION SECTION
<br />RELATED TO EXTERIOR PLANTING
<br />
<br />3'MULCH. DONOTPlACEMULCH
<br />IN CONTACT WlTH SHRUB STEM
<br />WEED BARRIER FABRIC
<br />EDGE CONDITION VARIES, SEE PLAN
<br />EDGING,SEEPLAN
<br />CONTAINER GROWN MATERlALSHALL
<br />HAVE ROOTS HAND LOOSENED
<br />PlANTINGSOILFORSHRUBS
<br />MIN. 4" DEEPER THAN ROOT BALL
<br />___., ._____" ,__ SCARIFY SIDES AND BOTTOM OF
<br />
<br />. C:,R(-- ~~~~Ne::ITH~U:~i:~~D
<br />~UNDISTlJRBEDSUBGRADE
<br />
<br />
<br />SCAlE,3{.\"l'.{I'
<br />
<br />r';_~N UK: D~Tf"L.' Sfl'1;"~.[)WG
<br />
<br />
<br />4' ORGANIC MULCH,
<br />DO NOT PLACE
<br />MULCH IN CONTACT
<br />WITH TREE TRUNK.
<br />4" BUILT-UP EARTl-l
<br />SAUCER BEYOND
<br />EDGE OF ROOT BALL
<br />EDGE CONDITION
<br />VARIES,SEEPlAN
<br />COMPACT PLANTING
<br />SOIL TO 85 PERCENT
<br />OFMAXlMUMORYUNIT
<br />WEIGHT ACCORDING
<br />TOASTMD698
<br />
<br />NOTE:
<br />CONTRACTOR SfW.L BE RESPONSIBLE
<br />FOR MAINTAINING TREES IN APLUMB
<br />POSITION Tl-lROUGHOUT THE WARRANTY
<br />PERIOD. WRAP TREE TRUNKS ONLY UPON
<br />,APPROVAL BY lANDSCAPE ARCHITECT,
<br />SEE SPECIFICATION SECTION RELATED
<br />TO EXTERIOR PLANTING
<br />
<br />EACH TREE SHALL BE P!ANTED SUCH
<br />THAT THE ROOT FtARE IS VlSIBLE AT
<br />THETOPOFTl-lERooTBALL IF THE
<br />ROOT FlARE IS NOT VISIBLE, THE SOIL
<br />SHALL BE REMOVED IN A LEVEL MANNER
<br />FROM Tl-lE ROOT BALL TO WHERE THE
<br />FIRST MAIN ORDER ROOT (ii" DIA. OR
<br />lARGER) EMERGES FROM THE TRUNK.
<br />SET MAIN ORDER ROOT 1" HIGHER THAN
<br />AOJACENTGRADE.DONOTCOVERTOP
<br />OF ROOT BALL WITH SOIL.
<br />6'MIN_DIAMETERMULCHRING
<br />
<br />):~0~
<br />
<br />>-'-",-:'<(
<br />UNDISTURBED SUBGRADE --:'".'",')~
<br />DIGPlANTINGPIT4"T06"------"'~
<br />DEEPER THAN ROOT BAlL
<br />REMOVE BURlAP, TWiNE, ROPE AND
<br />WIRE FROM TOP HALF OF ROOT BALL
<br />
<br />SCARIFY SIDES OF TREE PIT
<br />WITH SPADE BY HAND TO
<br />BINDWlTHPREPAREDSOIL
<br />PlANTING PITTO BE TWO
<br />TO FIVE TIMES THE DIAMETER
<br />OF ROOT BAlL, SLOPED
<br />TAMP SOil AROUND ROOT BAlL BASE
<br />FIRMLY WiTH FOOT PRESSURE SO
<br />THATRODTBALLDOESNOTSHIFT
<br />PLACE RDOT BALL ON UNDISTURBED
<br />OR COMPACTED SOIL
<br />
<br />~
<br />
<br />TREE PLANTING DETAIL
<br />
<br />SCAI.E:1I2'"l'.{I'
<br />
<br />"C-'-",,,U','Tf.- ")1';'
<br />
<br />PLANTING DETAILS
<br />
<br />
<br />POPEASSO(IATEsINc'
<br />1255ENERGVPARKDKlVE
<br />ST.PAUL,MNs5,oa.SEI&
<br />PH.{G51;G42.g200
<br />FAX{('>1)6~.-"o;
<br />
<br />ARDEN
<br />HILLS
<br />PLAZA
<br />ARDEN HILLS, MN
<br />
<br />
<br />CITY
<br />SUBMITTAL
<br />
<br />LANDSCAPE
<br />NOTES &
<br />DETAILS
<br />
<br />-._rrm.:
<br />
<br />ISSUED
<br />R€ISSUED
<br />
<br />511l112D07
<br />8m112007
<br />
<br />
<br />...~ito.,
<br />...
<br />....
<br />
<br />'6226-07012
<br />
<br />"
<br />
<br />SHEET
<br />
<br />L200
<br />
|