Laserfiche WebLink
<br />, <br />; <br />i <br />, <br />1 <br />, <br />1 <br />" <br />!l <br />Ii <br />.' <br />II <br />,I <br />~ <br /> <br />GENERAL NOTES <br /> <br />1. lANDSCAPE COtnRACTOR SHALL INSPECT THE SITE AND BECOME <br />FAMIUAR WITH EXISTING CONomON$ RELATING TO mE NATURE AND <br />SCOPE OF WORK. <br />2. LANDSCAPE CONTRACTOR SHALL VERIFY PLAN LAYOUT AND BRING TO <br />THE ATTEtmON OF THE lANDSCAPE ARCHITECT DISCREPANCIES WHICH <br />MAY COMPROMISE THE DESIGN OR INTENT OF THE LAYOUT. <br />lANDSCAPE CONTRACTOR SHAll ASSURE COMPLWlCE WITH <br />APPLICABLE CODES AND REGUlATiONS GOVERN!NG THE WORK AND <br />MATERIALSSUPPUED. <br />4. LANDSCAPE CONTRA.CTORSHALL PROTECT EXISTING ROADS, <br />CURBS/GUTTERS, TRAILS, TREES, LAWNS AND SITE ELEMENTS DURING <br />CONSTRUCTION OPERATIONS. DMlAGE TO SAMESHALL BE REPAIRED AT <br />NO ADOmONAL COST TO THE OWNER. <br />5. LANDSCAPE CONTRACTOR SHALL VERIFY AUGNMENT AND LOCATION OF <br />UNDERGROUND AND ABOVE GRADE unLmEs AND PROVIDE THE <br />NECESSARY PROTECTION FOR SAME BEFORE CONSTRUCTION BEGINS <br />(MINIMUM 10' CLEARANCE). <br />6, LANDSCAPE CONTRACTOR SHALL COORDINATE THE PHASES OF <br />CONSTRUCTION AND PLANTING lNSTAUATlON WITH OTHER <br />CONTRACTORS WORKING ON SITE. <br />7. UNDERGROUND UTlLmES SHALL BE INSTALLED SO THATTRENCHES DO <br />NOT CUT THROUGH ROOT SYSTEMS OF EXISTiNG TREES TO REMAIN. <br />8. EXISTING CONTOURS, TRAILS, VEGETATION, CURBIGUTTERANDOTl-lER <br />ELEMENTS ARE BASED UPON INFORMATION SUPPLIED TO Tl-lE lANDSCAPE <br />ARCHITECT BY OTHERS. lANDSCAPE CONTRACTOR SHALL VERIFY <br />DISCREPANCIES PRIOR TO CONSTRUCTION AND NOTIFY lANDSCAPE <br />ARCHITECT OF SAME. <br />S. HORIZONTAL AND VERTICAL ALIGNMENT OF PROPOSED WALKS, TRAILS OR <br />ROADWAYS ARE SUBJECTTO FIElD ADJUSTMENT REQUIRED TO <br />CONFORM TO LOCAl.1ZED TOPOGRAPHIC CONDITIONS AND TO MINIMIZE <br />TREE REMOVAL AND GRADiNG. CHANGES IHALlGNMENT AND GRADES <br />MUST BE APPROVED BY THE lANDSCAPE ARCHITECT PRIOR TO <br />IMPLEMENTATION. <br />10. lANDSCAPE CONTAACTOR SHALL REVlEWTl-lE SITE FOR DEFICIENCIES IN <br />SITE CONDITIONS WHICH MIGHrNEGATlVELY AFFECT PLANT <br />ESTABUSHMENT, SURVIVAL OR WARRANTY. UNDESIRABLE SITE <br />CONDITIONS SHALL BE BROUGHT TO Tl-lE ATTENTION OF lliE lANDSCAPE <br />ARCHITECT PRIOR 10 BEGINNING OF WORK. <br />11. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR ONGOING MAINTENANCE <br />OF NEWLY INSTALLED MATERIALS UNTIL TIME OF SUBSTANTIAL <br />COMPLETION. REPAIR OF ACTS OF VANDALISM OROAW.GE WHICH MAY <br />OCCUR PRIOR TO SUBSTANTIAL COMPLETION SHALL BE THE <br />RESPONSIBILITY OF THE lANDSCAPE CONTRACTOR. <br />12. EXISTING TREES OR SIGNIFICANT SHRUB MASSINGS FOUND ON SITE <br />SfW.L BE PROTECTED AND SAVED UNLESS NOTED TO BE REMOVED OR <br />ARE LOCATED IN AN AREA TO BE GRADED. QUESTIONS REGARDING <br />EXISTING PlANT MATERIAL SHALL BE BROUGHT TO THE ATTENTION OF <br />THE lANDSCAPE ARCHITECT PRIOR TO REMOVAL <br />13. EXISTING TREES TO REMAIN, UPON DIRECTION OF lANDSCAPE <br />ARCHITECT, SHALL BE FERTILIZED AND PRUNED TO REMOVE DEAD WOOD, <br />DAMAGED AND RUBBING BRANCHES. <br />14. lANDSCAPE CONTRACTOR SHALL PREPARE AND SUBMIT A WRITTEN <br />REQUEST FOR Tl-lE SUBSTANTIAL COMPLETION INSPECTION OF <br />lANDSCAPE AND SITE IMPROVEMENTS PRIOR TO SUBMlmNG FINAL PAY <br />REQUEST. <br />15. LANDSCAPE CONTRACTOR SHALL PREPARE AND SUBMIT REPRODUCIBLE <br />AS-BUILT DRAWING(S) OF LANDSCAPE INSTALlATION, IRRIGATION AND <br />SITE IMPROVEMENTS UPON COMPLETlON OF CONSTRUCTION <br />INSTALtATlON AND PRIOR TO SUBSTANTIAL COMPLETION. <br /> <br />GRADING NOTES <br /> <br />1. ROUGH GRADING AND FINISHED GRADING TO BE DONE BY OTl-lERS <br />EXCEPT WHERE NOTED, <br />GRADING UMITS ARE DEFINED AS THE JUNCTURE OF PROPOSED GRADE <br />WITH EXISTING GRADE UNLESS NOTED OTHERWISE. <br />3_ GRADING UMITS AND UMITS OF WORK SHOWN ON PLAN ARE ONLY <br />APPROXIMATE AND MAY BE ADJUSTED IN F1ELD BY lANDSCAPE <br />ARCHITECT. WORK OUTSIDE OF THESE LIMITS WILL BE OONEAT <br />LANDSCAPE CONTRACTORS EXPENSE UNLESS DIRECTED BY lANDSCAPE <br />ARCHITECT OR OWNER IN WRITING. <br />4. FILUCUT AS NECESSARY TO PROVIDE A 1%%% MINIMUM GRADE AWAY <br />FROM BUILDINGS WITHIN UMITS OF CONSTRUCTION. <br /> <br />SCHEMA TIC LANDSCAPE PLAN <br /> <br />5. SALVAGE TOPSOIL FROM THE EAATHWORKAREASASAPPROPRIATE OR <br />AS DIRECTED BY LANDSCAPE ARCHITECT AND STOCKPILE FOR REUSE IN <br />LOCATION APPROVED BY OWNER <br />6. MAINTAIN A UNIFORM GRADE BETWEEN CONTOURS IN AREAS TO BE <br />GRADED UNLESS NOTED OTl-lERWlSE. <br />ELEVATIONS, IF SHOWN ARE FINISHED ELEVATIONS. SPOT ELEVATIONS <br />TAKE PRECEDENCE OVER CONTOURS. <br />8. ADD EROSION CONTROL MEASURES IF GRADES GREATER THAN 3:1 OR IF <br />CONDITIONS WARRANT. REFER TO MNDDT SPECIFICATIONS FOR EROSION <br />CONTROL. <br />9. lANDSCAPE CONTRACTOR SHALL CONTACT PUBUC UTILITIES FOR <br />LOCATION OF UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, <br />MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. <br />lANDSCAPE CONTRACTOR SHALL REPAIR OR REPLACE Tl-lE ABOVE IF <br />DAMAGED DURING CONSTRUCTION AT NO ADDITIONAl. COST TO ruE <br />OWNER <br />10. LANDSCAPE CONTRACTOR SHALL PROVIDE PROPER EROSION CONTROL <br />MEASURES AS REQUIRED TO INSURE THAT EROSION IS KEPTTO AN <br />ABSOLUTE MINIMUM. <br />11. PROVIDE TEMPORARY COVERING FOR CATCH BASINS AND MAN HOLES <br />UNTIL FINISHED GRADING IS COMPLETE. <br />12 CONTRACTOR SHAlL CONSTRUCT DRAINAGE BASINS AS NEEDED. <br />13 PERIMETER SILT FENCE AND ROCK CONSTRUCTION ENTRANCES SHALl BE <br />INSTALLED PRIOR TO CONSTRUCTION. REFER TO MNDDT SPECIFICATIONS <br />FOR AGGREGATE BASE AND SILT FENCE. <br />14. CONTRACTOR SHAlL INSTALL CATCH BASIN EROSION CONTROL <br />MEASURES PER MPCA (MINNESOTA POLLUTION CONTROL AGENCY) <br />SPECS. <br />15. WITHIN TWO WEEKS OF RNISHED SITE GRADING, DISTURBED AREAS <br />SfW.LBE STABILIZED WITH SEED, SOD, MULCH OR ROCK BASE. <br />16. CONTRACTORSHALl MAINTAIN EROSION CONTROL MEASURES, <br />INCLUDING Tl-lE REMOVAL OF ACCUMULATED SILT IN FRONT OF SILT <br />FENCES AND EXCESS SEDIMENT IN PROPOSED CATCH BASINS, FOR THE <br />DURATION OF CONSTRUCTION. <br />17. LANDSCAPE CONTRACTOR SfW.L REMOVE EROSION CONTROL MEASURES <br />AFTER VEGETATION IS ESTABliSHED AND DISPOSE OF OFF SITE. <br /> <br />PLANTING NOTES <br /> <br />NO PLANTS WILL BE INSTALLED UNTIL FINAL GRADING AND <br />CONSTRUCTION HAS SEEN COMPLETED IN THE IMMEDIATE AREA. <br />2. PROPOSED PlANT MATERIAL SHALL COMPLY WITH THE CURRENT EDITION <br />OF THE AMERICAN STANDARD FOR NURSERY STOCK, ANSl Z60,l, UNLESS <br />NOTED OTl-lERWISE, DECIDUOUS SHRUBS SHAl.L HAVE ATlEAST 5 CANES <br />AT THE SPECIFIED HEIGKT. ORNAMENTAL TREES SHALl HAVE NOV <br />CROTCHES AND SHAll. BEGIN BRANCHING NO LOWER THAN 3' FEET <br />ABOVE THE ROOT BALL. STREET #10 SOULEVARO TREES SfW.L BEGIN <br />BRANCHING NO LOWER THAN 6' ABOVE PAVED SURFACE. <br />3. PlANT SYMBOLS ON PlAN DRAWiNG TAKES PRECEDENCE OVER PLANT <br />SCHEDULE IF DISCREPANCIES IN QUANTITIES EXIST. SPECIFICATIONS <br />AND DETAILS TAKE PRECEDENCE OVER NOTES. <br />4. PROPOSED PLANT MATERIAl. SHALL BE LOCATED AND STAKED AS SHOWN <br />ON PlAN. lANDSCAPE ARCHITECT MUST APPROVE STAKlNG OF PlANT <br />MATERIAL PRIOR TO DIGGING. <br />5. NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS <br />APPROVAL IS GRANTED BY lliE lANDSCAPE ARCHITECT TO THE <br />LANDSCAPE CONTRACTOR PRIOR TO THE SUBMISSION OF BID. <br />6. ADJUSTMENTS IN LOCATION OF PROPOSED PlANT MATERIALS MAYBE <br />NEEDED IN FIELD. LANDSCAPEARCI'lITECT MUST BE NOTIFIED PRIOR TO <br />ADJUSTMENT OF PlANTS. <br />7. PLANT MATERIALS TO BE INSTALLED PERPlANTlNG DETAILS. <br />8. PlANT MATERIAL SfW..L BE FERTlUZEO UPON INSTALlATION WITH DRIED <br />BONE MEAL, OTHER APPROVED FERTIUZER MIXED IN WITH THE PLANTlNG <br />SOIL PER THE MANUFACTURER'S INSTRUCTIONS OR MAY BE TREATED FOR <br />SUMMER AND FAlL INSTALtATlON WITH AN APPlICATION OF GRANUlAR <br />1(}..O.5 OF 12 or. PER 2.5" CALIPER TREE AND 6 oz. PER SHRUB WITH AN <br />ADDITIONAL APPLICATION OF 10-0-10 THE FOLLOWING SPRING IN Tl-lE <br />TREE SAUCER. <br />9. PlANTING AREAS RECEIVING GROUND COVER, PERENNIALS, ANNUALS OR <br />VINES SfW.L RECEIVE A MINIMUM OF 12" DEPTH OF PlANTING SOIL <br />CONSISTING OF 45 PARTS TOPSOIL, 45 PARTS SCREENED COMPOST AND <br />10 PARTS SAND OR AS OTHERWISE SPECIFIED. <br />10 TREE WRAPPING MATERIAL SHALL BE TWO-WALLED PtASTIC SHEETING <br />APPLIED FROM TRUNK FLARE TO FIRST BRANCH. WRAP SMOOTH-BARKED <br />DECIDUOUS TREES PLANTED IN Tl-lE FAlL PRIOR TO DECEMBER 1 AND <br />REMOVE WRAPPING AFTER MAY 1. <br /> <br />11, 3f16"THICKSTEa EDGER TO BE USED TO CONTAIN SHRUBS, PERENNIALS <br />AND ANNUALS WHERE PlANTING BED MEETS SOD UNLESS OTHERWISE <br />NOTED. <br />12. ANNUAL AND PERENNIAL PlANTING BEDS TO RECEIVE 3' DEEP SHREDDED <br />HARDWOOD MULCH Wlll-I NO WEED BARRIER. <br />13. SHRUB BED MASSINGS TO RECEIVE 4" OEEP SHREDDED HARDWOOD <br />MULCH Wlll-I FIBER MAT WEED BARRIER <br />14. CONIFEROUS TREES ARE TO RECEIVE 4' OEEP SHREDDED HARDWOOD <br />MULCH #10 SHALL HAVE NO MULCH IN DIRECT CONTACT WITH THE TREE <br />TRUNK <br />15. MAINTENANCE STRIPS, WHERE ILLUSTRATED, TO HAVE EDGER AND <br />MULCH AS INDICATED ON DRAWiNGS OR IN SPECIFICATIONS. <br />16. lANDSCAPE COmRACTORSHALL WARRANTY NEW PLANT MATERIAL <br />THROUGH ONE CALENDAR YEAR FROM Tl-lE DATE OF SUBSTANllAL <br />COMPLETION. NO PARTIAL ACCEPTANCE WILL BE CONSIDERED. <br />17. UNLESS NOTED OTHERWISE, THE,APPROPRIATE OATES FOR SPRING <br />PLANT MATERIAL INSTALlATION IS FROM THE TIME GROUND HAS THAWED <br />TO JUNE 15. <br />16, CONIFEROUS PlANTING IS ACCEPTABLE FROMAUGUST15 TO OCTOBER 1. <br />FALL DECIDUOUS PlANTING IS ACCEPTABLE FROM THE FIRST FROST <br />UNTIL NOVEMBER 15. ADJUSThlENTS TO PlANTING DATES MUST BE <br />APPROVED IN WRITlNG BY THE lANDSCAPE ARCHITECT, <br /> <br />IRRIGATION NOTES <br /> <br />1. LANDSCAPE CONTRACTOR SHA1LBE RESPONSIBLE FOR PROVlDING AN <br />IRRIGATION tAYOUT PLAN AND SPECIFICATION AS PART OF lliE SCOPE OF <br />WORK. SUBMIT lAYOUT PLAN AND SPECIFICATIONS FOR,APPROVAL BY <br />THE lANDSCAPE ARCHITECT PRIOR TO ORDER AND/OR CONSTRUCTION. <br />IT SHALL BE THE lANDSCAPE CONTRACTOR'S RESPONSIBILITY TO INSURE <br />THAT SODDEOISEEDED AND PLANTED AREAS ARE IRRIGATED PROPERLY, <br />INCLUDING Tl-lOSE AREAS OIRfClt Y AROUND AND ABlJTTING BUILDING <br />fOUNDATION. <br />2. LANDSCAPE CONTRACTORSHALl VERIFY (EXISTING) IRRIGATION SYSTEM <br />tAYOUT ANDCONFIRM COMPLETE LIMITS OF IRRIGATION PRIOR TO <br />SUPPLYING SHOP DRAWINGS. <br />3. LANDSCAPE CO~CTORSHALl PROViDE THE OWNER WITH AN <br />IRRIGATION SCHEDULE APPROPRIATE TO THE PROJECT SITE CONDITIONS <br />AND TO PLANTED MATERIAL GROWTH REQUIREMENTS. <br />4. lANDSCAPE CONTRACTORSHALL INSURE THAT SOIL CONDITIONS AND <br />COMPACTION ARE ADEQUATE TO AlLOW FOR PROPER DRAINAGE <br />AROUND THE CONSTRUCTION SITE. UNDESIRABLE CONDITIONS SHALL BE <br />BROUGHT TO Tl-lE ATTENTION OF THE lANDSCAPE ARCHITECT PRIOR TO <br />BEGINNING OF WORK IT SHALl BE THE LANDSCAPE CONTRACTOR'S <br />RESPONSIBILITY TO INSURE PROPER SURFACE AND SUBSURFACE <br />DRAINAGE IN PlANTING AREAS, <br /> <br />TURF NOTES <br /> <br />t SOD AREAS DISTURBED DUE TO GRADING UNLESS NOTED OTl-lERWISE. <br />2, WHERE SOD ABUTS PAVED SURFACES, FINISHED GRADE OF SODISEED <br />SHALL BE HELD 1" BELOW SURFACE ELEVATION OFTRAlL, SLAB, CURB, <br />ETC. <br />SOD SHAlL BE LAID PARALLEL TO THE CONTOURSANDSfW.L HAVE <br />STAGGERED JOlNT5. ON SLOPES STEEPER THAN 3:1 OR IN DRAINAGE <br />SWALES, SOD SHALL BE STAKED SECURELY, <br />4, UNLESS NOTED OTHERWlS~ THE,APPROPRlATE DATES FOR SPRING SEEO <br />& SOD PlACEMENT IS FROM THE TIME GROUND HAS THAWED TO JUNE 15. <br />5. FALL SODDING IS GENERALLY ACCEPTABLE FROM AUGUST 15 TO <br />NOVEMBER 1, FALL SEEOING IS GENERALLY ACCEPTABLE FROM AUGUST <br />15TO SEPTEMBER 15. ADJUSTMENTS TO SOD/SEED PLANTING DATES <br />MUST BE APPROVED IN WRITING BY THE LANDSCAPE ARCHITECT. <br /> <br />PREPARE SOIL FOR <br />THE ENTIRE BED <br /> <br />NOTE: <br />SEESPECIFICAT!ONSECTlON <br />RElATED TO EXTERIOR PlANTING <br /> <br />3'MULCH. DO NOT PlACE MULCH <br />IN CONTACT WITH PLANT STEM <br />EDGE CONDITION VARIES, SEE PLAN <br />EOGING,SEEPLAN <br />CONmNERG~~MATE~SHAlL <br />HAVE ROOTS HAND LOOSENED <br />PlANTING SOIL FOR PERENNIALS <br />SCARlFYSIDES AHD BOTTOM OF <br />ENTIRE BED WITH SPADE BY HAND <br />TO BINO WlTl-l PlANTING SOIL <br />UNDISTlJRBEDSUBGRADE <br /> <br /> <br />1 <br />l100 <br /> <br />PERENNIAL PlANTING DETAIL <br /> <br />SCALE:314'.l'.{I' <br /> <br />?l.NmNGDETIlJ <br /> <br />'/C<",,-,;}WG <br /> <br />2 <br />L100 <br /> <br />SHRUB PLANTING DETAIL <br /> <br />NOTE: <br />SEE SPECIFICATION SECTION <br />RELATED TO EXTERIOR PLANTING <br /> <br />3'MULCH. DONOTPlACEMULCH <br />IN CONTACT WlTH SHRUB STEM <br />WEED BARRIER FABRIC <br />EDGE CONDITION VARIES, SEE PLAN <br />EDGING,SEEPLAN <br />CONTAINER GROWN MATERlALSHALL <br />HAVE ROOTS HAND LOOSENED <br />PlANTINGSOILFORSHRUBS <br />MIN. 4" DEEPER THAN ROOT BALL <br />___., ._____" ,__ SCARIFY SIDES AND BOTTOM OF <br /> <br />. C:,R(-- ~~~~Ne::ITH~U:~i:~~D <br />~UNDISTlJRBEDSUBGRADE <br /> <br /> <br />SCAlE,3{.\"l'.{I' <br /> <br />r';_~N UK: D~Tf"L.' Sfl'1;"~.[)WG <br /> <br /> <br />4' ORGANIC MULCH, <br />DO NOT PLACE <br />MULCH IN CONTACT <br />WITH TREE TRUNK. <br />4" BUILT-UP EARTl-l <br />SAUCER BEYOND <br />EDGE OF ROOT BALL <br />EDGE CONDITION <br />VARIES,SEEPlAN <br />COMPACT PLANTING <br />SOIL TO 85 PERCENT <br />OFMAXlMUMORYUNIT <br />WEIGHT ACCORDING <br />TOASTMD698 <br /> <br />NOTE: <br />CONTRACTOR SfW.L BE RESPONSIBLE <br />FOR MAINTAINING TREES IN APLUMB <br />POSITION Tl-lROUGHOUT THE WARRANTY <br />PERIOD. WRAP TREE TRUNKS ONLY UPON <br />,APPROVAL BY lANDSCAPE ARCHITECT, <br />SEE SPECIFICATION SECTION RELATED <br />TO EXTERIOR PLANTING <br /> <br />EACH TREE SHALL BE P!ANTED SUCH <br />THAT THE ROOT FtARE IS VlSIBLE AT <br />THETOPOFTl-lERooTBALL IF THE <br />ROOT FlARE IS NOT VISIBLE, THE SOIL <br />SHALL BE REMOVED IN A LEVEL MANNER <br />FROM Tl-lE ROOT BALL TO WHERE THE <br />FIRST MAIN ORDER ROOT (ii" DIA. OR <br />lARGER) EMERGES FROM THE TRUNK. <br />SET MAIN ORDER ROOT 1" HIGHER THAN <br />AOJACENTGRADE.DONOTCOVERTOP <br />OF ROOT BALL WITH SOIL. <br />6'MIN_DIAMETERMULCHRING <br /> <br />):~0~ <br /> <br />>-'-",-:'<( <br />UNDISTURBED SUBGRADE --:'".'",')~ <br />DIGPlANTINGPIT4"T06"------"'~ <br />DEEPER THAN ROOT BAlL <br />REMOVE BURlAP, TWiNE, ROPE AND <br />WIRE FROM TOP HALF OF ROOT BALL <br /> <br />SCARIFY SIDES OF TREE PIT <br />WITH SPADE BY HAND TO <br />BINDWlTHPREPAREDSOIL <br />PlANTING PITTO BE TWO <br />TO FIVE TIMES THE DIAMETER <br />OF ROOT BAlL, SLOPED <br />TAMP SOil AROUND ROOT BAlL BASE <br />FIRMLY WiTH FOOT PRESSURE SO <br />THATRODTBALLDOESNOTSHIFT <br />PLACE RDOT BALL ON UNDISTURBED <br />OR COMPACTED SOIL <br /> <br />~ <br /> <br />TREE PLANTING DETAIL <br /> <br />SCAI.E:1I2'"l'.{I' <br /> <br />"C-'-",,,U','Tf.- ")1';' <br /> <br />PLANTING DETAILS <br /> <br /> <br />POPEASSO(IATEsINc' <br />1255ENERGVPARKDKlVE <br />ST.PAUL,MNs5,oa.SEI& <br />PH.{G51;G42.g200 <br />FAX{('>1)6~.-"o; <br /> <br />ARDEN <br />HILLS <br />PLAZA <br />ARDEN HILLS, MN <br /> <br /> <br />CITY <br />SUBMITTAL <br /> <br />LANDSCAPE <br />NOTES & <br />DETAILS <br /> <br />-._rrm.: <br /> <br />ISSUED <br />R€ISSUED <br /> <br />511l112D07 <br />8m112007 <br /> <br /> <br />...~ito., <br />... <br />.... <br /> <br />'6226-07012 <br /> <br />" <br /> <br />SHEET <br /> <br />L200 <br />