My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-03-07-JOINT PC/CC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2007
>
10-03-07-JOINT PC/CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 8:51:14 AM
Creation date
9/27/2007 9:02:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
964
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Memorandum to Dennis Trooien, Dennis Properties <br />Subject: Traffic and Parking Study for Proposed Redevelopment of Arden Plaza <br />Page 4 of 15 <br />September 17. 2007 <br /> <br />RESPONSES TO TRAFFIC QUESTIONS <br /> <br />Changes in Trip Generation due to Proposed Redevelopment (Question a) <br /> <br />To determine how the proposed redevelopment would affect the total trip generation for the site <br />during the a.m. peak hour, p.m. peak hour, and on a daily basis, the following approach was <br />used: <br /> <br />I) We completed traffic counts at the driveway intersections on County Road E and <br />Lexington Avenue on a typical weekday during the p.m. peak period. Using those traffic <br />counts, we determined the existing total p.m. peak hour trip generation for the site. <br /> <br />2) Since the proposed redevelopment involves removal of the existing office buildings, it is <br />important to divide the total trip generation for the site between retail and office. To <br />determine what portion of the existing trip generation is due to the office and what <br />portion is due to retail, we developed trip generation estimates for the existing uses based <br />on data presented in the Institute of Transportation Engineers' (ITE) Trip Generation, <br />Seventh Edition. Based on the relationship between the estimated office and retail trips, <br />we divided the existing trip generation for the site between retail and office. <br /> <br />3) As described earlier, there presently is some vacant space both in the office and retail <br />buildings. To determine the true change in trip generation for the site due to the proposed <br />redevelopment, it is important to calculate the total trip generation for the site with <br />existing uses fully occupied. Thus, the existing retail and office trips from step 2 were <br />increased by a ratio of total square feet to occupied square feet. The resultant trip <br />generation from this step is the total trip generation for the site with full occupancy of the <br />existing uses. <br /> <br />4) Trip generation for the proposed new retail uses was estimated based on data presented in <br />ITE Trip Generation, Seventh Edition. <br /> <br />5) We removed trips due to the existing office buildings from the total trip generation for <br />the site with full occupancy of existing uses. We then added trip generation for the new <br />retail uses from step 4 to determine total trip generation for the site upon completion of <br />the proposed redevelopment. <br /> <br />6) Trip generation for the a.m. peak hour and on a daily basis was estimated using the p.m. <br />peak hour counts and based on the relationship between p.m. peak hour and a.m. peak <br />hour and daily trip generation as per ITE data. <br /> <br />Table I shows a comparison of the trip generation for existing uses with full occupancy and upon <br />completion of the proposed redevelopment. As indicated in Table 1, the proposed <br />
The URL can be used to link to this page
Your browser does not support the video tag.