Laserfiche WebLink
Rule C: Storm -Water Management Plans I Rice Creek Watershed District <br />Page 4 of 4 <br />• (i) In cases where structures are proposed below the runout elevation of land -locked basins, the low -floor elevation <br />will be a minimum of two feet above the high water level as determined from an estimate of highwater levels <br />determined from the highest of either the 100 -year, ten-day runoff event or back-to-back 100 -year, twenty -four- <br />hour rainfalls. Aerial photos, vegetation, soils, and topography will be used to derive a normal water elevation for <br />the basin for purposes of computing the 100 -year elevation. <br />< Rule B: Permit Procedural Requirements up Rule D: Erosion Control Plans > <br />printer -friendly version <br />Rice Creek Watershed District 4325 Pheasant Ridge Drive, Suite 611 Blaine, Minnesota, 55449-4539 <br />Phone: (763) 398-3070 / Fax: (763)398-3088 <br />Copyright 2002-2006 <br />About this website <br />http://www.ricecreekwd.corn/rules/rcwd/c 11/13/2006 <br />