My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-03-07-JOINT PC/CC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2007
>
10-03-07-JOINT PC/CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 8:51:14 AM
Creation date
9/27/2007 9:02:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
964
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 9 of 26 <br />Permit No: MN R10000I <br />an individual permit application. If MPCA's written notification requires a response, <br />failure to respond within the specified timeframe constitutes a permit violation. <br />The SWPPP must factor in any findings of and include any storm water mitigation measures <br />required as the result of any environmental, archeological or other required local, state or federal <br />review conducted for the project. For the purposes of this permit provision, mitigation measures <br />mean avoiding, minimizing, rectifying (e.g., repairing, rehabilitating, restoring), reducing, <br />eliminating or compensating for impacts related to: (1) storm water discharges associated with <br />the project's construction activity; and (2) erosion prevention, sediment control and the <br />permanent storm water management system for the project. <br />6. The SWPPP must provide additional measures as necessary to assure compliance with surface <br />and ground water standards in Minn. R. chapters 7050 and 7060 in karst areas and to ensure <br />protection of drinking water supply management areas (see Minn. R. 4725.4450). <br />7. If runoff from the site discharges to an impaired water which has an approved TMDL <br />implementation plan containing requirements for construction storm water discharges, the <br />Permittee must include the following in the SWPPP: <br />a. identify the receiving water and the areas of the site discharging to it; and <br />b. BMPs that are appropriate for the site and sufficient to comply with all <br />applicable requirements of the TMDL implementation plan. <br />B. TEMPORARY SEDIMENT BASINS <br />Where ten (10) or more acres of disturbed soil drain to a common location, a temporary (or <br />permanent) sediment basin must be provided prior to the runoff leaving the construction site or <br />entering surface waters. The Permittee is encouraged, but not required, to install temporary <br />sediment basins where appropriate in areas with steep slopes or highly erodible soils even if less than <br />ten (10) acres drains to one area. The basins must be designed and constructed according to the <br />following requirements: <br />1. The basins must provide storage below the outlet pipe for a calculated volume of runoff from a 2 <br />year, 24 hour storm from each acre drained to the basin, except that in no case shall the basin <br />provide less than 1800 cubic feet of storage below the outlet pipe from each acre drained to the <br />basin. <br />2. Where no such calculation has been performed, a temporary (or permanent) sediment basin <br />providing 3,600 cubic feet of storage below the outlet pipe per acre drained to the basin, shall be <br />provided where attainable until final stabilization of the site. <br />Temporary basin outlets must be designed to prevent short-circuiting and the discharge of <br />floating debris. The basin must be designed with the ability to allow complete basin drawdown <br />(e.g., perforated riser pipe wrapped with filter fabric and covered with crushed gravel, pumps or <br />other means, see Part IV.D.) for maintenance activities, and provide a stabilized emergency <br />overflow to prevent failure of pond integrity. Energy dissipation must be provided for the basin <br />outlet (see Part IV.13.4). <br />wq-stnn2-5 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.