My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-03-07-JOINT PC/CC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2007
>
10-03-07-JOINT PC/CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 8:51:14 AM
Creation date
9/27/2007 9:02:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
964
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 14 of 26 <br />Permit No: MN 8100001 <br />that the inspection and maintenance requirements of Part W.E. are complied with. The location of <br />areas not to be disturbed must be delineated (e.g. with flags, stakes, signs, silt fence etc.) on the <br />development site before work begins. <br />2. All exposed soil areas with a continuous positive slope within 200 lineal feet of a surface water, <br />must have temporary erosion protection or permanent cover for the exposed soil areas year <br />round, according to the following table of slopes and time frames: <br />Type of Slope <br />Time (Maximum time an area can <br />remain open when the area <br />Steeper than 3:1 <br />7 days is not actively being worked.) <br />10:1 to 3:1 <br />14 days <br />Flatter than 10:1 <br />21 days <br />These areas include constructed storm water management pond side slopes, and any exposed soil <br />areas with a positive slope to a storm water conveyance system, such as a curb and gutter <br />system, storm sewer inlet, temporary or permanent drainage ditch or other natural or man made <br />systems that discharge to a surface water. Temporary stockpiles without significant silt, clay or <br />organic components (e.g., clean aggregate stockpiles, demolition concrete stockpiles, sand <br />stockpiles) are exempt from this requirement but must comply with Part IV.C.S. <br />3. The normal wetted perimeter of any temporary or permanent drainage ditch that drains water <br />from a construction site, or diverts water around a site, must be stabilized within 200 lineal feet <br />from the property edge, or from the point of discharge to any surface water. Stabilization must <br />be completed within 24 hours of connecting to a surface water. <br />4. Pipe outlets must be provided with temporary or permanent energy dissipation within 24 hours <br />of connection to a surface water. <br />C. SEDIMENT CONTROL PRACTICES <br />1. Sediment control practices must minimize sediment from entering surface waters, including <br />curb and gutter systems and storm sewer inlets. <br />a. Temporary or permanent drainage ditches and sediment basins that are designed as part of a <br />treatment system (e.g., ditches with rock check dams) require sediment control practices <br />only as appropriate for site conditions. <br />b. If the down gradient treatment system is overloaded, additional upgradient sediment control <br />practices must be installed to eliminate the overloading, and the SWPPP must be amended to <br />identify these additional practices as required in Part III.A.4, a. through c. <br />c. In order to maintain sheet flow and minimize rills and/or gullies, there shall be no unbroken <br />slope length of greater than 75 feet for slopes with a grade of 3:1 or steeper. <br />2. Sediment control practices must be established on all down gradient perimeters before any <br />upgradient land disturbing activities begin. These practices shall remain in place until final <br />stabilization has been established in accordance with Part W.G. <br />wq-strrn2-51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.