My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-03-07-JOINT PC/CC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2007
>
10-03-07-JOINT PC/CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 8:51:14 AM
Creation date
9/27/2007 9:02:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
964
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 23 of 26 <br />Permit No: MN R 100001 <br />APPENDIX B. DEFINITIONS <br />1. "Best Management Practices (BMPs)" means erosion and sediment control and water quality <br />management practices that are the most effective and practicable means of controlling, preventing, <br />and minimizing degradation of surface water, including avoidance of impacts, construction -phasing, <br />minimizing the length of time soil areas are exposed, prohibitions, and other managernent practices <br />published by state or designated area -wide planning agencies. <br />Individual BMPs found in this permit are described in the current version of Protecting Water <br />Ouality in Urban Areas, Minnesota Pollution Control Agency 2000. BMPs must be adapted to the <br />site and can be adopted from other sources. However, they must be similar in purpose and at least as <br />effective and stringent as MPCA's BMPs. (Other sources include manufacturers specifications, <br />Storm Water Management for Construction Activities: Developing Pollution Prevention Plans <br />and Best Management Practices, U.S. Environmental Protection Agency 1992, and Erosion <br />Control Design Manual, Minnesota Department of Transportation, et al, 1993). <br />2. "Commissioner" means the Commissioner of the Minnesota Pollution Control Agency or the <br />Commissioner's designee. <br />3. "Common Plan of Development or Sale" means a contiguous area where multiple separate and <br />distinct land disturbing activities may be taking place at different times, on different schedules, but <br />under one proposed plan. One plan is broadly defined to include design, permit application, <br />advertisement or physical demarcation indicating that land -disturbing activities may occur. <br />4. "Construction Activity" For this permit, construction activity includes construction activity as <br />defined in 40 C.F.R. part 122.26(b)(14)(x) and small construction activity as defined in 40 C.F.R. <br />part 122.26(b)(15). This includes a disturbance to the land that results in a change in the topography, <br />existing soil cover (both vegetative and non -vegetative), or the existing soil topography that may <br />result in accelerated storm water runoff, leading to soil erosion and movement of sediment into <br />surface waters or drainage systems. Examples of construction activity may include clearing. <br />grading, filling and excavating. Construction activity includes the disturbance of less than one acre <br />of total land area that is a part of a larger common plan of development or sale if the larger common <br />plan will ultimately disturb one (1) acre or more. <br />5. "Dewatering" means the removal of water for construction activity. It can be a discharge of' <br />appropriated surface or groundwater to dry and/or solidify a constriction site. It may require <br />Minnesota Department of Natural Resources permits to be appropriated and if contaminated may <br />require other MPCA permits to be discharged. <br />6. "Energy Dissipation" means methods employed at pipe outlets to prevent cr,sion. Examples <br />include, but are not limited to: concrete aprons, riprap, splash pads, and gabions that are designed to <br />prevent erosion. <br />7. "Erosion Prevention" means measures employed to prevent erosion including but not limited to: soil <br />stabilization practices, limited grading, mulch, temporary or permanent cover, and construction <br />phasing. <br />8. "Final Stabilization" means that either: <br />a. All soil disturbing activities at the site have been completed and a uniform (e.g., evenly <br />distributed, without large bare areas) perennial vegetative cover with a density of 7W°'o of the <br />wq-strm2-51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.