My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-03-07-JOINT PC/CC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2007
>
10-03-07-JOINT PC/CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 8:51:14 AM
Creation date
9/27/2007 9:02:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
964
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• LOS E represents operating conditions at or near the capacity of the intersection. <br />Average delays of 35 to 50 seconds per vehicle are experienced at unsignalized <br />intersections and from 55 to 80 seconds at signalized intersections. Freedom to <br />maneuver within the traffic stream is very difficult. Any incident can be expected to <br />produce a breakdown in traffic flow with extensive queuing. <br />• LOS F describes forced flow operation at very low speeds. Operations are <br />characterized by stop-and-go traffic. Long average delays of more than 50 seconds <br />per vehicle occur at unsignalized intersections and of more than 80 seconds per <br />vehicle at signalized intersections. <br />Though there are no hard and fast guidelines in Minnesota for what level of service is <br />considered acceptable, it is typical for an intersection with an overall LOS C to be <br />considered acceptable in rural areas and for an overall LOS D to be acceptable in more <br />urban or developing areas. <br />IV. EXISTING CONDITIONS <br />A. Existing Traffic Operations <br />Turn movement counts for the a.m. and p.m. peak hours were taken in May 2006 and <br />then adjusted for seasonal variation. The resulting a.m. and p.m. peak hour turn <br />volumes are shown in Figure 1. Existing a.m. and p.m. peak hour traffic conditions <br />were modeled using Synchro/SimTraffic simulation software. The resulting a.m. and <br />p.m. peak hour levels of service and average vehicle delays for the four study <br />intersections are shown in Table 1. <br /> <br />Northwestern College Master Plan 3 13529.000 <br />Traffic and Parking Impact Study
The URL can be used to link to this page
Your browser does not support the video tag.