My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-03-07-JOINT PC/CC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2007
>
10-03-07-JOINT PC/CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 8:51:14 AM
Creation date
9/27/2007 9:02:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
964
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />VI. YEAR 2018 CUMULATIVE CONDITIONS <br />A. Future Campus Expansion Trip Generation and Distribution <br />Year 2018 Cumulative Conditions represent projected traffic operations with <br />background growth and campus expansion. Future trip generation due to campus <br />expansion and corresponding increases in student enrollment, faculty, and staff, was <br />estimated for the a.m. and p.m. peak hours. These estimates were based on existing <br />hour-by-hour gate counts taken in April 2006 which were used to calculate the current <br />rate of peak hour trips per total commuter students, faculty and staff. This calculated <br />rate was then applied to the projected future year commuter student, faculty, and staff <br />populations to derive trip generation totals. Incoming and outgoing trips were <br />determined based on the two-directional gate count data. The total net increases in <br />campus-related turn volumes at Master Plan buildout are shown in Figure No. 3. <br />Northwestern College Master Plan 11 13529.000 <br />Traffic and Parking Impact Study
The URL can be used to link to this page
Your browser does not support the video tag.