My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-03-07-JOINT PC/CC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2007
>
10-03-07-JOINT PC/CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 8:51:14 AM
Creation date
9/27/2007 9:02:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
964
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />A net increase of 238 a.m. peak hour trips and 365 p.m. peak hour trips are <br />anticipated from campus expansion at buildout. The distribution of campus-generated <br />trips was estimated based on existing commuter student, faculty and staff residential <br />zip codes. Estimated distribution percentages for commuter students and college <br />faculty and staff are shown in Table 3. <br />B. Year 2018 Cumulative Traffic Operating Conditions <br />Estimated Year 2018 cumulative traffic turn volumes are shown in Figure 4. The <br />results of the future traffic analysis with campus expansion and no roadway <br />improvements are summarized in Table 4. The net differences between 2018 <br />Cumulative Conditions and 2018 Background Conditions represents the impact of the <br />Northwestern College Campus Expansion. As shown in Table 4, the most significant <br />impacts of the expansion are projected to occur at Fairview Avenue/Lydia Avenue <br />and at the College entrance at the intersection with Lydia Avenue and Lincoln Drive. <br />At Fairview Avenue/Lydia Avenue future p.m. peak hour traffic operations would fall <br />to LOS D overall, and the southbound approach would drop to LOS E in part due to <br />campus-generated traffic moving through the intersection. At Lydia Avenue/College <br />entrance overall operations would fall to LOS F with the southbound (College <br />outbound) approach operations falling to LOS F with nearly eight minutes of delay per <br />vehicle. The Snelling Avenue intersections could be expected to operate about the <br />same in 2018, with or without the college expansion. <br />Northwestern College Master Plan 13 13529.000 <br />Traffic and Parking Impact Study
The URL can be used to link to this page
Your browser does not support the video tag.