Laserfiche WebLink
<br />6. The guardrails on which the antennas will be mounted are structurally capable of <br />handling the additional load. <br /> <br />On the Conditional Use Permit Evaluation Criteria: <br />7. The proposed plan would not have any impact on traffic or parking conditions <br />8. The proposed plan will not produce any permanent noise, glare, odors, vibration, smoke, <br />dust, air pollution, heat, liquid or solid waste, and other nuisance characteristics <br />9. The proposed plan will not impact drainage <br />10. The proposed plan will not impact population density <br />11. The proposed plan is not expected to have a significant impact on visual and land use <br />compatibility with uses and structures on surrounding land or adjoining land values <br />12. Park dedications are not applicable <br />13. The proposed plan does not conflict with the general purpose and intent of the zoning <br />code or the Comprehensive Development Plan for the City. The applicant's access to the <br />facility will not increase the risks of contamination to the City's water supply; <br /> <br />On the Special Requirements for City Water Towers: <br />14. The proposed plan is not anticipated to have any impact on the risks of contamination to <br />the City's water supply <br />15. With the replacement ofthe Nextel antennas there will be sufficient room on the structure <br />to accommodate the applicant's proposed antennas <br />16. The proposed plan is not anticipated to increase the water tower or reservoir maintenance <br />costs to the City <br />17. The proposed plan will not be harmful to the health of workers maintaining the water <br />tower or reservoir. <br /> <br />Recommendation <br /> <br />The Planning Commission reviewed Planning Case 07-024 and unanimously recommends <br />approval of the CUP Amendment based on the findings of fact and the submitted plans as <br />amended by the following twelve conditions: <br />1. The project shall be completed in accordance with the plans submitted as amended by <br />the conditions of approval. Any significant changes to these plans, as determined by <br />the City Planner, shall require review and approval by the Planning Commission and <br />City Conncil. <br />2. The antennas and all monnts shall be painted to match the color of the water tower. <br />3. Upon removal of any equipment the applicant shall repair all holes, scratches, rust, or <br />damage to the tower caused by the supports from these antennas and the tower shall <br />be repainted with primer and matching paint to ensure that the metal is protected. <br />4. A building permit shall be obtained for all proposed antennas prior to installation. <br />5. At the time the new antennas are placed on the water tower those that have been <br />identified for removal shall be removed. <br />6. The applicant shall comply with the City Engineer's memo dated May 23, 2007. <br /> <br />\lAhdocslIAHlAHdata\PlanningIPlanning Cases\2007\07-024 Sprint-Nexte/ CUP Amendment (PCApproval)\J02907 - CC Report - Sprint CUP <br />Amendment.doc <br /> <br />Page3 of 4 <br />