Laserfiche WebLink
<br />The Planning Commission tabled the application at the October 3, 2007, Planning Commission <br />meeting at the request of the applicant. Additional time was needed for the applicant to discuss <br />the results of the traffic study with Ramsey County and with the City. A revised traffic study has <br />since been submitted (Attachment 3A-I). Unless otherwise noted in this report, the <br />redevelopment proposal is unchanged from the information contained in the October 3,2007, <br />version of the planning case report. The new information in this report includes the updated <br />traffic study, the updated drawing ofthe monument sign proposal, and additional public <br />comments. <br /> <br />Proiect Proposal and Process <br /> <br />1. Project Description <br /> <br />The 12.55 acre Arden Plaza property includes two buildings: a retail strip mall with <br />approximately 55,000 square feet and the "pod office building" with 45,944 square feet of <br />gross floor area. The applicant proposes to demolish the pod office building, construct three <br />new buildings, retain the strip mall, and subdivide the property into four lots: <br /> <br /> Lot Size Building Coverage (sf) % Building Coverage % Landscaping <br />Lot 1 - Retail Strip 287,693 52,580 18.28% 27.40% <br />Lot 2 - Walgreens 80,229 14,490 18.06% 28.50% <br />Lot 3 69,520 16,230 23.35% 23.60% <br />Lot 4 44,075 14,300 32.44% 18.20% <br />Total 481,517 97,600 20.27% 26.19% <br />Requirement 13,000 or more 40% or less 25% or more <br />'"'Lot and building numbers are from Sheet A 1.1 in Attachment 3D-1. The coverage numbers of Lot 3 and <br />4 are subject to change during the site plan review process for those properties. <br /> <br />The proposed tenant for Lot 2 is a Walgreen's store. The developer does not yet have tenants <br />for lots three or four. <br /> <br />2. Planned Unit Development (PUD) Process: <br /> <br />The Planned Unit Development (PUD) process is typically at least a two step process. The <br />first step is the Master PUD, and the second step is the Final PUD. In some instances, the <br />Final PUD or a portion ofthe Final PUD is reviewed with the Master PUD. In other <br />instances, the development is separated into phases over a period of time. This <br />redevelopment proposal is a hybrid version ofthese two options, which is permissible. <br /> <br />The PUD process is a tool that provides additional flexibility for developments that an <br />underlying zoning district would not otherwise allow. For example, a PUD may change the <br /> <br />City of Arden Hills <br />Planning Commission Meetingfor November 7, 2007 <br /> <br />\lMetro-inet.us\ardenhillslPlanning\Planning Cases\2007\07-0lB Arden Plaza PUD (In Review)\/ /0707 - PC Report -Arden Plaza -Master <br />PUD.doc <br /> <br />Page 2 of12 <br />