Laserfiche WebLink
<br />TODD POLUM, PE, PTOE <br />Senior Associate <br /> <br /> <br />AREAS OF EXPERTISE <br />. Freeway Operation Studies <br />. Corridor Shtdies <br />. Geometric Layout <br />. l1affic Impact Studies <br />. Intersection Analysis <br />. Safety and Accident Studies <br />. Traffic Signal Design <br />. Public Involvement <br /> <br />EDUCATION <br />B.S.c.E., University of Wisconsin - Platteville <br /> <br />REGISTRATION <br />Minnesota (PE) No. 44314 <br />Wisconsin (PE) No. 34687-006 <br />CERTIFICATION <br /> <br />Professional Traffic Operations Engineer <br />(PTOE) <br /> <br />WisDOT TIA Preparers Certification <br />No. SE05-804-076 <br /> <br />PROFESSIONAL AFFILIATIONS <br /> <br />Institute of Transportation Engineers <br /> <br />CONTINUING EDUCATION <br />Freeway Modeling <br />Pre-TImed Signal & Actuated Signal <br />Traffic Management of Land Development <br />TEAPac Software <br />Freeway Design and Operations <br />Fundamentals of Geometric Design <br />Human Factors <br />Traffic Calming <br />Systematic Development of Informed <br />Consent <br /> <br />~CONSULTING GROUP, INC. <br />ENGINEERS I PLANNERS I DESIGNERS <br /> <br />Mr. Polurn has ten years of transportation engineering experience, Prior <br />to joining SRF, he served as a traffic and design engineer with the <br />Wisconsin Department of Transportation, where he participated in <br />numerous traffic analysis and roadway reconstruction projects. Mr. <br />Polum leads SRF's freeway modeling and operational analysis activities. <br />He has the knowledge and expertise to provide solutions to difficult <br />issues and is actively involved in corridor studies, preliminary design, <br />traffic impact studies, freeway modeling and operational analysis. <br /> <br />PROJECT EXPERIENCE <br /> <br />. Twin Cities Army Ammunition Plant ADAR Traffic Analysis, Arden <br />Hills, Minnesota <br /> <br />. Medtronic Office Development, Traffic Impact Study, Blaine, <br />Minnesota <br /> <br />. 1-394 MnPass Phase II (Toll-lane) Freeway Analysis, Golden Valley, <br />Minnetonka, and Minneapolis, Minnesota <br /> <br />. Twins Stadium EIS Freeway Capacity Review, Minneapolis, <br />Minnesota <br /> <br />. Vikings Stadium Freeway Capacity Revievv, Blaine, Moundsview, New <br />Breighton, and Arden Hills, Minnesota <br /> <br />. Legacy of Apple Valley, Traffic Impact Study, Apple Valley, Minnesota <br /> <br />. Blue Cross Blue Shield East Campus, Traffic Impact Study, Eagan, <br />Minnesota <br /> <br />. Lowe's Traffic Impact Study, Fargo, North Dakota <br /> <br />. Block 64, Traffic Impact Study, Hopkins, Minnesota <br /> <br />. YMCA Traffic Study, Eau Claire, Wisconsin <br /> <br />. 1-494 Fish Lake Interchange Freeway Analysis and Interstate Access <br />Modification Request, Maple Grove, Plymouth, Minnetonka, <br />Minnesota <br /> <br />. Mall of America Phase II Freeway Analysis, Bloomington, Minnesota <br /> <br />. 1-94/34th Street Interchange Study Freeway Analysis and Interstate <br />Access Modification Request, Moorhead, Minnesota <br /> <br />. 1-494/TH 120 Interchange and Corridor Study Freeway Analysis and <br />Interstate Access Modification Request, Woodbwy and Maplewood, <br />Minnesota <br /> <br />. 1-394/TH 12 Corridor Study Freeway Analysis, Golden Valley and <br />Minnetonka, Minnesota <br /> <br />. I -494/TH 169 Preliminary Design Freeway Analysis, Eden Prairie, <br />Edina and Bloomington, Minnesota <br /> <br />. 1-35W/TH 62 Preliminary and Final Design Freeway Analysis and <br />Interstate Access Modification Request, Richfield and Minneapolis, <br />Minnesota <br />