Laserfiche WebLink
<br />Principal <br /> <br /> .. <br /> .. <br /> "Ij <br /> tr1 <br /> tr1 <br />Billing CI:l <br />Rate/Hour n <br />::c <br /> tr1 <br />$130.00 U <br />c:: <br />$122.00 r <br />tr1 <br />$117.00 <br />$109.00 <br />$102.00 <br />$93.00 <br />$83.00 <br />$74.00 <br />$66.00 <br />$60.00 <br />$55.00 <br />$48.00 <br />$61.00 <br />$32.00 <br />$136.00 <br />$162.00 <br /> <br /> <br />.. <br />.. <br /> <br />2007 Rate Schedule <br /> <br />Associate <br /> <br />Sr. Project Manager <br /> <br />Project Manager II <br /> <br />Project ManagerlEngineering Specialist III <br /> <br />Registered EngineerlRegistered Land SurveyorlEngineering Specialist II <br /> <br />Project Engineer/Engineering Specialist lISr. Construction Observer <br /> <br />Engineering Technician V/Construction Observer/Grad Engineer <br /> <br />Engineering Technician IV/Scientist III <br /> <br />Engineering Technician III/Scientist II <br /> <br />Engineering Technician II/Scientist I <br /> <br />Engineering Technician I <br /> <br />Office Technician II <br /> <br />Office Technician I <br /> <br />Survey (Two-Person Crew/GPS Crew) <br /> <br />Survey (Three-Person Crew/Expanded GPS Crew) <br /> <br />Costs associated with word processing, vehicle mileage, cell phones, reproduction of common <br />correspondence and mailing are included in the above hourly rates. <br /> <br />Reimbursable expenses include costs associated with plan, specification and report reproduction, <br />permit fee, delivery cost, etc. <br /> <br />Rate Schedule is <br /> <br />.. <br />WSB <br /> <br />- 20- <br /> <br />.. <br />.. <br /> <br />&Assoc;all's,/nc. <br />