Laserfiche WebLink
<br />. Assemble and review existing historical utility system operating data. <br />. Develop a pro forma cash flow statement showing projected usage, total operating <br />revenue, and total expenses, including operations and maintenance costs, depreciation, <br />department servicing, net income, debt, etc. to test adequacy of existing and proposed <br />rates. <br />. Review utility rates and user charges to determine if the rates and charges are sufficient <br />to pay for operations and capital improvements. <br />. Review connection charges and review the policy for SAC and WAC charges as they <br />relate to the City's redevelopment efforts, as necessary and appropriate. <br />. IdentifY future capital projects and utility funding requirements for the relevant time <br />period, to be provided by City staff. <br />. IdentifY any additional issues. <br />,/ The use of debt vs. cash to pay for capital improvements. <br />,/ Minimum cash balance for the utility fund. <br />,/ To ensure the fees are sufficient to operate the utilities and not require a future <br />tax levy. <br />,/ Establish a financing plan for funding current and future capital improvements <br />and operational expenses. <br /> <br />Step 2. Provide a comparison of utility rates and connection fees in comparable commnnities. <br />The survey will compare water, sanitary sewer fees, and/or storm water fees charged for a <br />single family home in Arden Hills with fees charged by comparable communities. <br /> <br />Materials/Services to be Provided by the City <br /> <br />. City population projections and estimated new connections per year <br />. Historic water usage for 2004 through 2007, including number of residential, <br />commercial, and industrial connections; water pumping records; gallons billed; <br />. Historic sanitary sewer usage for 2004 through 2007, including usage billed <br />. Current water connection information, including residential and commercial/industrial <br />information <br />. Current 2007 and 2008 operating budgets and actual operating results for 2006. <br />. Current billing system information, including rates and billing schedule and availability <br />to analyze usage on a meter and a category basis. <br />. Current connection charges and basis for calculating <br />. Existing water, sanitary sewer, and storm water cash and investment balances <br />. Capital improvements for five to ten year basis (estimated) for each utility <br />. Operations and management expenses (estimated) by utility <br />. General information as necessary <br /> <br />Project Cost and Completion Date <br />Estimated Time for Completion: <br /> <br />City of Arden Hills, Utility Rate Study Proposal <br /> <br />January 2, 2008 <br />Page 3 <br />