My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7A
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
01-14-08-R
>
7A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2008 8:44:43 AM
Creation date
1/16/2008 8:41:18 AM
Metadata
Fields
Template:
General
Document
PMP for Asbury Ave and Ridgewood Road
General - Type
Agenda Item
Date
1/14/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />If unsuitable material is encountered beneath the existing pavement during construction, it will <br />be removed and replaced with suitable backfill material. Any sod that is damaged as a result of <br />the project will be replaced. In order to match the new street, driveway approaches will be <br />removed between the existing pavement and approximately the property line. A four foot (4') <br />concrete apron will be constructed behind the curb, and the remainder of the removed portion of <br />the driveway will be replaced in-kind with asphalt or concrete. <br /> <br />During construction, City staff will work with those property owners who wish to make driveway <br />improvements. The cost of any private driveway improvements is the property owner's <br />responsibility. <br /> <br />The PCls of the streets under consideration are not as low as others in the City, however, <br />reconstruction is being proposed at this time for the following reasons. The soil borings indicate <br />that the existing structure of the street is inadequate. Roseville's project would stop mid-block, <br />therefore, this project is also being proposed to provide continuity in this section of the <br />neighborhood and limit the inconvenience of construction to one season. With Lake Johanna <br />nearby, the need to address water quality issues with storm sewer improvements also adds to the <br />need for this project. <br /> <br />Street design <br />At our neighborhood meeting in December, the residents were comfortable with the width and <br />design that is being proposed along the Roseville section of the streets. The type of curb and <br />gutter proposed is S5 I 8 curb, which has a lower back and is a type of surmountable curb. <br />Existing street grades will be altered where appropriate to address drainage. <br /> <br />EXISTING UTILITY CONDITIONS <br /> <br />Public utilities located within the proposed project areas include City water, storm sewer, and <br />sanitary sewer. Private utilities include Xcel gas and electric, telephone, and cable TV. <br /> <br />Watermain <br />The following is a table ofthe existing watermain with information on pipe size, material and <br />history of watermain breaks over the last 10 years. <br /> <br />Street Watermain size Pipe material Break history <br />Asbury Avenue 8" Cast iron 0 <br />Ridgewood Road 6" Cast iron 0 <br /> <br />Public Works staff also reviewed all of the hydrants and gate valves within the proposed project <br />to evaluate the existing conditions and gain an understanding of what repairs and improvements <br />are necessary. <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.