Laserfiche WebLink
<br />Capital Improvement Plan <br />City of Arden Hills, Minnesota <br /> <br />2013 thru 2017 <br /> <br />Contact Public Works Director <br />Department Water Department <br />Type Maintenance <br />Useful Life <br />Category Infrastructure Improvements <br />Priority nla <br /> <br />Project # 04- W -002 <br />Project Name Repair/Repaint South Water Tower <br /> <br />Total Project Cost $555,140 <br /> <br />Description I <br />The items that are in need of repair are laid out in the 2005 inspection report. Areas to be addressed include: <br />-Mold <br />- Mildew <br />-Rust <br />- Chipping Paint <br />Both the exterior and interior of the south water tower will be examined, The City logo will be placed on the outside of <br />the water tower. <br /> <br />Repair South Water Tower - $55,140 - 2008 <br /> <br />Repaint exteriorlLogo - $500,000 - 2013 <br /> <br />Justification I <br /> <br />Standard maintenance procedure to extend the life of the south side water tower. Every 10 years reconditioning work <br />should be scheduled. <br /> <br />Prior <br />55,140 I <br /> <br />Total <br /> <br />Expenditures <br />Construction/Maintenance <br /> <br />2013 <br />500,000 <br />500,000 <br /> <br />2014 <br /> <br />2015 <br /> <br />2016 <br /> <br />2017 <br /> <br />Total <br />500,000 <br /> <br />500,000 <br /> <br />Total <br /> <br />Prior <br />55,140 I <br /> <br />Total <br /> <br />Funding Sources <br />Water Utility Funds <br /> <br />2013 <br />500,000 <br /> <br />500,000 <br /> <br />2014 <br /> <br />2015 <br /> <br />2016 <br /> <br />2017 <br /> <br />Total <br />500,000 <br /> <br />500,000 <br /> <br /> <br />Total <br /> <br />Produced Using the Plan-lt Capital Planning Software <br /> <br />Saturday, January 12, 2008 <br />