Laserfiche WebLink
<br />Capital Improvement Plan <br />City of Arden Hills, Minnesota <br /> <br />2008 thru 2012 <br /> <br />Contact Public Works Director <br /> <br />r Project # <br />! Project Name <br />I <br /> <br />04-Park 011 <br /> <br />Replacement Play Structure at Valentine Park <br /> <br />Department Parks Department <br /> <br />Type Improvement <br />Useful Life <br /> <br />Category Park Capital Improvements <br /> <br />Priority nla <br /> <br />Total Project Cost $320,000 <br /> <br />Description I <br />Replace the play structure at Valentine Park with an ADA approved structure. The play structure will be designed for <br />the 4 to 9 year old age group. The play structure will also include a new wood chip base with a plastic wood base. In <br />addition, the play structure may need to be relocated to a different area of the park. The City is currently evaluating <br />Valentine Park, which has drainage issues. <br /> <br />Drainage Study to be performed in 2008. <br /> <br />Justification I <br /> <br />The play structure was installed in 1990. On the City's 20 year replacement schedule, it should be replaced in 2010, <br />however, the decision regarding ValentinePark and it's drainage issues will be a factor. <br /> <br />Expenditures 2008 2009 2010 2011 2012 Total <br />Planning/Design 20,000 20,000 <br />Construction/Maintenance 300,000 300,000 <br />Total 20,000 300,000 320,000 <br /> <br />Funding Sources 2008 2009 2010 2011 2012 Total <br />General Fund 55,000 55,000 <br />Surface Water Mgmt Utility Fu 20,000 245,000 265,000 <br />Total 20,000 300,000 320,000 <br /> <br />Produced Using the Plan-lt Capital Planning Software <br /> <br />Saturday, January 12, 2008 <br />