My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4F, Pavement Condition Index Survey
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
01-28-08-R
>
4F, Pavement Condition Index Survey
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2008 3:15:16 PM
Creation date
1/25/2008 3:13:31 PM
Metadata
Fields
Template:
General
Document
Pavement Condition Index Survey
General - Type
Aenda Item
Date
1/28/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />GoodPointe Technology Copy-Page 1 of 1 <br />(please authorize and return to GoodPointe Technology) <br /> <br />Proposed Scope of Services - City of Arden Hills <br /> <br />GoodPointe Technology proposes to provide the City of Arden Hills with the following services: <br /> <br />Task 1.0 Pavement Condition Survey and Data Entry <br />The Pavement Condition Index (PC I) data collection survey will cover the selected streets within <br />the City of Arden Hills pavement network. The surface condition survey proposed in this task is <br />a walking survey in which 100 percent of the street surface will be evaluated. <br /> <br />At a minimum, the following bituminous pavement distress types will be collected as part of the <br />PCI Pavement Condition Survey: <br /> <br />Alligator Cracking <br />Block Cracking <br />Bumps <br />Corrugation <br />Depression <br />Edge Cracking <br />Flushing <br />Heaving <br />Lane-Shoulder Drop Off <br />Longitudinal Cracking <br /> <br />Patching <br />Polished Aggregate <br />Potholes <br />Railroad Crossing <br />Raveling <br />Reflective Cracking <br />Rutting <br />Shoving <br />Slippage Cracking <br />Transverse Cracking <br /> <br />GoodPointe Technology will enter all the data of the pavement condition survey, calculate the <br />PCI and then deliver the updated databases to the City for installation. The City will be able to <br />run system reports and budget scenario runs immediately after the installation of the updated <br />databases. <br /> <br />Basis of Payment: <br /> <br />Task 1,0 Pavement Condition Evaluation Survey and Data Entry <br />The pavement condition survey data will be conducted in the field on the selected pavement <br />sections within the City's jurisdiction and entered into the City's ICON program at a unit cost rate <br />of $225 per centerline mile, according to the terms specified in this proposal. <br /> <br />Total Estimated Costs: <br /> <br />Task Unit Units Total City <br /> Cost Renuested Cost SiQnature <br />1 $225 per centerline mile 31 $6,975.00 <br /> <br />After reviewing this document, please sign both copies. Keep one copy and return the other to <br />GoodPointe Technology. Receipt of this letter will serve as our authorization to proceed. <br /> <br />Invoices shall be submitted on a monthly basis with payment due immediately upon invoice. <br /> <br />Total Authorized Amount: $6,975.00 <br /> <br />Authorized by: <br />GoodPointe Technology <br /> <br />{Utv1ytfit-- <br /> <br />Anthony J. Kadlec <br />Vice President <br /> <br />Accepted by: <br />City of Arden Hills <br /> <br />By: <br /> <br />Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.