Laserfiche WebLink
<br />City of Arden Hills, Minnesota <br /> <br />Capital Improvement Plan <br /> <br />2008 thru 2012 <br /> <br />PROJECTS & FUNDING SOURCES BY DEPARTMENT <br />Department Project# Priority 2008 2009 2010 2011 2012 Total <br />lEconomic Development I <br />Gateway Signs 08-EDA-001 n/a 10,000 10,000 10,000 10,000 10,000 50,000 <br /> Economic Development Total 10,000 10,000 10,000 10,000 10,000 50,000 <br /> <br /> <br />IEquipment I <br />Replacement of 1990 Water Truck-Chassis 08-EqpV-001 n/a 125,000 125,000 <br />Replace 8-10 Pick-up Truck 08-EqpV-002 n/a 25,000 25,000 <br />Purchase Toro Groundsmasterw/Broom 09-Eqp-001 n/a 32,000 32,000 <br />Purchase F-250 4X4 Truck 09-EqpV-001 n/a 30,000 30,000 <br />Replace Fleetside Pick-up One Ton w/Hoist 09-EqpV-002 n/a 35,000 35,000 <br />Replace Jetter Truck 09-EqpV-003 n/a 130,000 130,000 <br />Toro Groundsmasterw/Broom 10-Eqp-001 n/a 60,000 60,000 <br />621 Tractorw/Plow 10-Eqp-002 n/a 100,000 100,000 <br />Skid Steer Loader-Snow Blower 10-Eqp-003 n/a 28,000 28,000 <br />Replace 1996 Roller 10-Eqp-004 n/a 10,000 10,000 <br />Replace 1989 Turf Sweeper 10-Eqp-005 n/a 17,000 17,000 <br />F-350 One Ton Pick-up W/Dump Truck 10-EqpV-001 n/a 62,000 62,000 <br />Brush Chipper 11-Eqp-001 n/a 50,000 50,000 <br />Replace 2002 Groundsmaster with Broom 11-Eqp-002 n/a 34,000 34,000 <br />1996 Trailer Replacement (Skidsteer/RDller) 11-Eqp-003 n/a 10,000 10,000 <br />Replace F250 Pickup Truck with Plow 11-EqpV-001 n/a 30,000 30,000 <br />Replace 2001 F450 One Ton Dump/Plow/Sander 11-EqpV-002 n/a 62,000 62,000 <br />Replace 1997 Taro Workman w/Sprayer 12-Eqp-001 n/a 17,000 17,000 <br />Replace 1997 Street Sweeper 12-Eqp-002 n/a 130,000 130,000 <br />Replace 2000 Backhoe 12-Eqp-003 n/a 85,000 85,000 <br />Replace 2002 F450 One-Ton w/Dump/Plow/Sander 12-EqpV-001 n/a 62,000 62,000 <br />Replace 1997 Dump Truck w/PlowlWing Plow/Sander 12-EqpV-002 n/a 150,000 150,000 <br /> Equipment Total 150,000 195,000 309,000 186,000 444,000 1,284,000 <br /> <br /> <br />Produced Using the Plan~It Capital Planning Software <br /> <br />Friday, January 25, 2008 <br />