My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7B, CIP Document
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
01-28-08-R
>
7B, CIP Document
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2008 8:35:57 AM
Creation date
1/28/2008 8:34:21 AM
Metadata
Fields
Template:
General
Document
7B, CIP Document
General - Type
Agenda Item
Date
1/28/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Capital Improvement Plan <br /> <br />City of Arden Hills, Minnesota <br /> <br />Project # 08-Park-00S <br />Project Name Replacement Play Structure at Valentine Park <br /> <br />2008 thru 2012 <br /> <br />Type Improvement <br />Useful Life <br />Category Park Capital Improvements <br /> <br />Priority n/a <br />Contact Public Works Director <br />Department Parks Department <br /> <br />Description I Total Project Cost $320,000 <br />Replace the play structure at Valentine Park with an ADA approved structure. The play structure will be designed for the 4 to 9 year old age <br />group. The play structure wil1 also include a new wood chip base with a plastic wood base. In addition, the play structure may need to be <br />relocated to a different area of the park. The City is currently evaluating Valentine Park, which has drainage issues. <br />Drainage Study to be perfonned in 2008. <br />Justification I <br />The play structure was installed in 1990. On the City's 20 year replacement schedule, it should be replaced in 2010, however, the decision <br />regarding ValentinePark and it's drainage issues will be a factor. <br /> <br />Expenditures 2008 2009 2010 2011 2012 Total <br />PlanninglDesign 20,000 20,000 <br />Construction/Maintenance 300,000 300,000 <br />Total 20,000 300,000 320,000 <br /> <br />Funding Sources 2008 2009 2010 2011 2012 Total <br />General Fund 55,000 55,000 <br />Suliace Water Mgmt Utility Fu 20,000 245,000 265,000 <br />Total 20,000 300,000 320,000 <br /> <br />I O~""O"" '~~WOili<' <br /> <br />Produced Using the Plan-It Capita/ Planning Sofiware <br /> <br />Friday. Janumy 25. 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.