Laserfiche WebLink
<br />Capital Improvement Plan <br /> <br />City of Arden Hills, Minnesota <br /> <br />Proj,,'# 08-W-002 <br />Proj'" Name Repair/Repaint South Water Tower <br /> <br />2008 thru 2012 <br /> <br />Type Maintenance <br />Useful Life <br />Category Infrastructure Improvements <br /> <br />Priority nla <br />Contact Public Works Director <br />Department Water Department <br /> <br />Description 1 Total Project Cost $555,140 <br /> <br />The items that are in need of repair are laid out in the 2005 inspection report. Areas to be addressed include: <br />-Mold <br />-Mildew <br />-Rust <br />~ Chipping Paint <br />Both the exterior and interior of the south water tower will be examined. The City logo will be placed on the outside of the water tower. <br /> <br />Repair South Water Tower - $55,140 - 2008 <br /> <br />Reva;"t ex'erior/Loeo - $500,000 - 2013 <br />Justification 1 <br />Standard maintenance procedure to extend the life ofthe south side water tower. Every 10 years reconditioning work should be scheduled. <br /> <br />Expenditures <br />Construction/Maintenance <br /> <br />2008 <br />55,140 <br /> <br />55,140 <br /> <br />2009 <br /> <br />2010 <br /> <br />2011 <br /> <br />2012 <br /> <br />Total <br />55,140 <br /> <br />55,140 <br /> <br />Future <br />500,000 I <br /> <br />Total <br /> <br />Total <br /> <br />Funding Sources <br />Water Utility Funds <br /> <br />2008 <br />55,140 <br /> <br />55,140 <br /> <br />2009 <br /> <br />2010 <br /> <br />2011 <br /> <br />2012 <br /> <br />Total <br />55,140 <br /> <br />55,140 <br /> <br />Future <br />500,000 I <br /> <br />Total <br /> <br />Total <br /> <br />I O~""OM' ""'",,- <br /> <br />Produced Using the Plan-It Capital Planning Sofllvare <br /> <br />Friday, January 25,2008 <br />