My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-28-08-Special
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2008
>
02-28-08-Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 1:27:10 PM
Creation date
2/22/2008 3:10:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Federal High Priority Project (HPP) funds and matching funds for these federal dollars. The <br />Council and Mn/DOT will monitor scope and costs to ensure major projects continue to meet <br />regional objectives in a cost effective manner. <br />• The plan envisions significant improvements in the bus system, including new express bus <br />routes, arterial corridor enhancements, suburb -to -suburb service, transit stations, park-and- <br />ride lots and other features. The goal is to increase transit ridership 50 percent by 2020 and <br />double it by 2030. <br />• The plan proposes additional express commuter bus corridors as well as enhancement and <br />expansion of existing bus service in freeway corridors. Within each corridor, express bus <br />routes will be supported by park-and-ride facilities, circulator networks, and "transit <br />advantages." <br />• The plan includes construction of five new "transitways" on dedicated rights-of-way by 2020 <br />to help slow the growth in traffic congestion and improve mobility, and three additional <br />transitways by 2030. Unlike the 2001 plan, the technology for each corridor was not <br />identified in the Plan; rather the most appropriate and cost-effective mode for any given <br />corridor is best determined after extensive study of the individual corridor. Figure 4-2 <br />(attached) shows the 2030 Transitway System and Express Commuter Bus System. <br />• The plan now includes detailed information on the facilities needed for transit passengers, <br />such as stations and park and ride lots, as well as facilities needed to support the transit <br />system, such as garages and bus layover sites. (Figures 4-5 and 4-6). Communities should <br />plan for development and redevelopment around stations and park-and-ride lots. <br />• Policy 18 (previously policy 17) on transportation and land use elements in local <br />comprehensive plans was rewritten and more detail provided in some strategies as to what <br />the Council expects in local comprehensive plans. <br />• The TPP now includes references to the regional aviation system as defined in the Aviation <br />Policy Plan. The 1996 Aviation Policy Plan remains in effect with the exception of the Land <br />Use Compatibility Guidelines for Aircraft Noise. These guidelines have been updated and <br />included in the TPP as Appendix H. <br />System Plan Considerations Affecting Your Community <br />1. Metropolitan Highways <br />Metropolitan highways and regional highway investment priorities for 2030 are shown in Figure <br />4-11. The city should refer to Tables 4-9 through 4-12 for major highway projects and proposed <br />timing. The following metropolitan highway located within Arden Hills is planned for <br />expansion: <br />• I-694 <br />2. Transit Routes and Facilities <br />Arden Hills is within the Metropolitan Transit Taxing District. Arden Hills is within Market <br />Area 111. Service options for Market Area III include peak -only express, small vehicle <br />circulators, midday circulators, special needs paratransit (ADA, seniors), and ridesharing. <br />T-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.