My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1B, TH10/CR96 Preliminary Design Issues & Positions
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
03-17-08-WS
>
1B, TH10/CR96 Preliminary Design Issues & Positions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2008 12:18:31 PM
Creation date
3/18/2008 12:16:44 PM
Metadata
Fields
Template:
General
Document
TH10/CR96 Prelim Design Issues
General - Type
Agenda Item
Date
3/17/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ARDEN HILLS CITY COUNCIL - March 10,2008 <br /> <br />DRAFT <br /> <br />17 <br /> <br /> <br />Councilmember Holmes disagreed with it being the preference. <br /> <br />Councilmember McClung stated that it should be strongly considered. <br /> <br />Mayor Harpstead asked for clarification if this was considered an end point or <br />phasing. <br /> <br />Councilmember Holmes stated that it could be considered both ways. <br /> <br /> <br />Councilmember McClung stated that this would need to be a higher priority and <br />something that the City would have to push for. <br /> <br />Councilmember Holden stated that Design Constraint #1 reviews the phasing <br />options to see if all four ramps are needed, and Councilmember Grant had brought <br />up that if there was half a diamond with the interchanges on the east then there <br />would not be a need for legs on the east so it wouldn't be a full interchange. She <br />stated that she thought the Council had agreed that it could work with just the exit <br />and entrance ramps on the east side. <br /> <br />Mayor Harpstead stated that this was complicated by the traffic pattern of <br />commuters that are west bound on County Road 96!North bound on Highway 10 <br />and the opposite in the evenings. The second element has been the semi truck <br />traffic from Scherer Brothers. <br /> <br />Mayor Harpstead would like Design Constraint #4 to include wording about <br />phasing. <br /> <br />It was the consensus of the Council to add Design Constraint #4 to address the at <br />grade signalized intersection at the Highway 10 diagonal with access to TCAAP <br />including wording about phasing. <br /> <br />Councilmember Grant stated that a fmancial plan needs to go along with this. <br /> <br />Councilmember Holden stated that MnJDOT was not plauning to reuse part of the <br />Highway 10 lanes that are there and the City had requested that they look at <br />repaving these. However, this was not captured in the document. She stated that it <br />could be included under Design Constraint #1 <br /> <br />Mayor Harpstead stated that it would fit under Design Constraint #3, which deals <br />with realignment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.